Sh. Ashish Kush, Planning Executive and Ms. Asha, Chartered Accountant briefed about the facts of the case. Sh. Mansoor Ali (AR), Sh. Nitish Dubey and Ms. Shatakshi are present on behalf of the promoter. The AR of the promoter states that KYC of directors and Authorised person to operate bank account are submitted today. Further, regarding the compliances of the earlier registration certificate of the part project vide registration no. 61 of 2017, it is noticed that the promoter has neither submitted the QPR nor the Annual report u/s 4(2)(l)(D) of the Act of 2016 and the registration certificate also stand expired on 28.08.2021. In this regard the AR of the promoter stated that the Occupation Certificate for the earlier registered part project vide registration no. 61 of 2017 has been obtained within the validity of registration and they assume that there is no need for extension of registration of the project. Further, the AR of the promoter assures that they will submit the QPR and the Annual report u/s 4(2)(l)(D) of the Act of 2016 alongwith application for extension of validity of registration within a period of 30 days and request to grant the registration of this part of the project. In view of the above, the Authority decided to approve the registration of the project as proposed subject to submission of QPR, the Annual report u/s 4(2)(l)(D) of the Act of 2016 and application for extension of validity of registration within 30 days. The registration certificate shall be issued after submission of the corrected (A-H), corrected online DPI and other pending compliances.
- Home
- RERA Projects
- Gurugram
- Godrej Aria & 101 (Vol. Iii)
GGM/747/479/2023/91
RERA overview
As filed by the promoter in Form REP-I with HRERA Gurugram.
- businessPromoter
- Godrej Properties Limited
- placeLocation
- Naurangpur
- mapTehsil / District
- Gurgaon, Gurugram
- verifiedRERA status
- Approved and certificate uploaded
- account_balanceAuthority
- HRERA Gurugram
- edit_calendarApplied on
- 12 Jul 2023
- architectureLayout plan approved
- 10 Feb 2020
- constructionConstruction start
- 01 Oct 2023
- event_availableCompletion date
- 31 Aug 2028
- workspace_premiumRegistration valid
- 18 Sep 2023 – 30 Aug 2028
- layersFAR (permissible / proposed)
- 175 / 4.9
- paymentsEstimated project cost
- ₹ 245.09 Cr
Licence
Land use 2.84 acres in all
Estimated cost ₹ 245.09 Cr in all
Promoter
- Company
- Godrej Properties Limited
- Registered office
- 3rd Floor, Um House, Tower a, Plot No.35, Sector 44, Gurugram, Haryana 122002
- CIN
- L74120MH1985PLC035308
Book a free site visit
Latest price, offers and a guided visit of Godrej Aria & 101 (Vol. Iii).
Mr Prashant Agarwal is available to discuss all your queries.
Online now · replies on WhatsApp
Quick questions
Plot sizes
1 sizes · 0 plots registered with RERA. Tap a column to sort.
| Sq yd | Sq ft | Sq m | Plots |
|---|---|---|---|
| 0 | 0 | 0 | 0 |
Areas are as registered with RERA (square metres); square yards and square feet are converted. Final sizes are as per the allotment.
Unit types
146 units in 1 types as registered with RERA.
| Type | Carpet area (sq ft) | Units |
|---|---|---|
| Apartment/Shops/Other Buildings | 843 – 1,458 | 146 |
Carpet areas as filed with RERA (square metres, shown in square feet). Booked / unsold are as on the RERA application date.
Facilities & services
14 facilities in the promoter's service plan estimate · ₹ 6.11 Cr budgeted.
-
add_road
Internal Roads and Pavements ₹ 67.2 L est.
-
water_drop
Water Supply System ₹ 85.1 L est.
-
water
Storm Water Drainage ₹ 33.3 L est.
-
bolt
Electricity Supply System ₹ 43 L est.
-
recycling
Sewage Treatment & Garbage Disposal ₹ 38.7 L est.
-
light
Street Lighting ₹ 10.9 L est.
-
local_fire_department
Security and Fire Fighting ₹ 18 L est.
-
check_circle
Soft Scape ₹ 28 L est.
-
check_circle
Hand Scape ₹ 18 L est.
-
bolt
Electrical Sub Station ₹ 94.4 L est.
-
check_circle
Signages ₹ 21 L est.
-
nature
Landscape ₹ 3.2 L est.
-
check_circle
High Side ₹ 60 L est.
-
fence
Compound Wall and Entrance Gate ₹ 89.7 L est.
Not in this filing Playgrounds and Parks Club House / Community Centre Shopping Area Renewable Energy System School Hospital / Dispensary
External connections
- radio_button_uncheckedRoads HSVP
- check_circleWater Supply HSVP
- check_circleElectricity DHBVN
- check_circleSewage Disposal HSVP
- radio_button_uncheckedStorm Water Drainage HSVP
Specifications
- Flooring Details of Various Parts of House
- VITRIFIED TILES
- Wall Finishing Details
- ACRYLIC EMULSION/OIL BOUND DISTEMPER
- Kitchen Details
- VITRIFIED TILES CERAMIC TILES 2'-0" ABOVE COUNTER & OIL BOUND DISTEMPER (LAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH HARDWOOD FRAME)(PREHUNG- LVL WITH LAMINATE)
- Bathroom Fittings
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Wood Work Etc
- (LAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH HARDWOOD FRAME)(PREHUNG- LVL WITH LAMINATE)
- Doors and Windos Frames
- (LAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH HARDWOOD FRAME)(PREHUNG- LVL WITH LAMINATE) POWDER COATED ALUMINUM / UPVC
- Glass Work
- 4MM AND ABOVE AS PER SPECIFICATION
- Electric Fittings
- AS PER BUILDING NORMS
- Conducting and Wiring Details
- AS PER BUILDING NORMS
- Water Storage
- UNDERGROUND WATER TANK AND OVERHEAD WATER TANK
- Lift Details
- 2 IN EACH TOWER- 1 PASSENGER AND 1 SERVICE
- Windows / Glazings
- POWDER COATED ALUMINUM / UPVC
- Doors
- (LAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH HARDWOOD FRAME)(PREHUNG- LVL WITH LAMINATE)
- Main Doors
- (LAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH HARDWOOD FRAME)(PREHUNG- LVL WITH LAMINATE)
- Internal Doors
- (LAMINATE FINISH FLUSH DOORS/MOULDED SHUTTER WITH HARDWOOD FRAME)(PREHUNG- LVL WITH LAMINATE)
- Electrical Fittings
- AS PER BUILDING NORMS
- External Finishing / Colour Scheme
- TBD
- Internal Finishing
- PROVIDING AND APPLYING 10 TO 12MM THICK PLASTER TO MASONRY AND RCC WALLS, COLUMNS ETC. IN CEMENT MORTAR 1:5 (1
- Floor
- VITRIFIED TILES
- Walls
- CERAMIC TILES TILL 7'-0" ON ALL SIDES & OIL BOUND DISTEMPER
- Ceiling
- CEMENT : 5 FINE AND COARSE SAND IN EQUAL PROPORTION) INCLUDING CUP-LOCK SCAFFOLDING, HACKING, CHICKEN/FIBRE WIRE MESH, MAKING GROOVES, CORNER PROFILES ETC. WHEREVER REQUIRED COMPLETE AS PER DESIGN AND DRAWING TO THE SATISFACTION OF SITE ENGINEER. INCLUDING BULL MARKING COMPLETE AS PER DRAWING. THE RATE QUOTED IS INCLUDING THE TILE MARKING IN TOILET &
- Floor
- LAMINATED WOODEN FLOORING
- Walls
- CERAMIC TILES TILL 7'-0" ON ALL SIDES & OIL BOUND DISTEMPER
- Ceiling
- ENGINEER. INCLUDING BULL MARKING COMPLETE AS PER DRAWING. THE RATE QUOTED IS INCLUDING THE TILE MARKING IN TOILET
- Floor
- ANTI SKID CERAMIC TILES
- Walls
- CERAMIC TILES TILL 7'-0" ON ALL SIDES & OIL BOUND DISTEMPER
- Ceiling
- ENGINEER. INCLUDING BULL MARKING COMPLETE AS PER DRAWING. THE RATE QUOTED IS INCLUDING THE TILE MARKING IN TOILET
- Counters
- 8 MM THICK STONE JET BLACK
- Sanitary Ware / Cp Fittings
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Fitting / Fixtures
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Floor
- VITRIFIED TILES
- Ceiling
- ENGINEER. INCLUDING BULL MARKING COMPLETE AS PER DRAWING. THE RATE QUOTED IS INCLUDING THE TILE MARKING IN TOILET
- Floor
- ANTI SKID CERAMIC TILES
- Walls
- CERAMIC TILES TILL 7' ON ALL SIDES & OIL BOUND DISTEMPER
- Ceiling
- GRID CEILING
- Counters
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Sanitary Ware / Cp Fittings
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Fixtures
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Floor
- VITRIFIED TILES
- Walls
- CERAMIC TILES 2'-0" ABOVE COUNTER & OIL BOUND DISTEMPER
- Ceiling
- OIL BOUND DISTEMPER
- Counters
- JET BLACK
- Fixtures
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Kitchen Appliances
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Floor
- VITRIFIED TILES
- Walls & Ceiling
- ACRYLIC EMULSION/OIL BOUND DISTEMPER
- Toilet
- ANTI SKID TILE
- Balcony
- ANTI SKID TILE
- Floor
- ANTI SKID TILE
- Walls & Ceiling
- ACRYLIC EMULSION/OIL BOUND DISTEMPER
- Railings
- MS STEEL
- Fixtures
- ALL PROVIDED OF STANDARD COMPANY MAKE
Statutory approvals
Approvals declared in Form REP-I Part E.
- verified Licence No. 47 of 2013 Obtained
- verified Renewal of Licence No. 47 of 2013 Obtained
- verified Licence No. 109 of 2014 Obtained
- verified Renewal of Licence No. 109 of 2014 Obtained
- verified Zoning Plan Obtained
- verified NOC for Height Clearance Obtained
- verified Revalidation of NOC for Height Clearance Obtained
- verified NOC for Height Clearance Obtained
- verified Revalidation of NOC for Height Clearance Obtained
- verified Approval of Building Plan Obtained
- verified Approval of Revised Building Plan Obtained
- verified HUDA NOC for Construction Purpose Obtained
- verified HUDA NOC for Construction Purpose Obtained
- verified Approval of Service Plan Estimates Obtained
- verified Approval of Fire Scheme Obtained
- verified Mining Approval Obtained
- verified Approval of Environment Clearance Obtained
- verified Forest NOC Obtained
- verified Forest NOC Obtained
- verified Assurance of Electrical Load Obtained
- verified Assurance of Water Supply Obtained
- verified Assurance of Sewerage Connection Obtained
- verified Cte Obtained
- verified Reavlidation of Building Plan Obtained
- verified Reavlidation of Building Plan Obtained
- verified Aravali NOC Obtained
- verified Aravali NOC Obtained
- verified NOC for Height Clearance (14.59 Acs) Obtained
- verified NOC for Height Clearance (2.83 Acs) Obtained
Plans filed with RERA
- radio_button_uncheckedLayout plan
- radio_button_uncheckedDemarcation plan
- check_circleZoning plan
- check_circleBuilding plan
- check_circleSite plan
- check_circleFloor plan
- check_circleApartment plans
- check_circleElevation section
- check_circleDetail of permissible FAR
- check_circleDetail of covered area achieved FAR
- radio_button_uncheckedRoads and pavement plan
- radio_button_uncheckedElectricity supply plan
- check_circleWater supply plan
- radio_button_uncheckedSewerage and garbage disposal plan
- check_circleStorm water drainage
- radio_button_uncheckedStreet lighting plan
- check_circleParking plan
RERA documents
46 documents downloaded from the HRERA portal. Opens as PDF.
Plans & layouts
Licence & approvals
CA certificates
Declarations
Other documents
Hearings & orders
Proceedings recorded by the Authority on this registration.
First hearing fixed
Development schedule
Planned spend each year, from the promoter's quarterly schedule.
Completion committed to RERA: 31 Aug 2028.
Godrej Aria & 101 (Vol. Iii)
Share your details and our expert will call you back.
- check_circle Free site visit
- check_circle Best price assistance
- check_circle Home loan help