Ms. Nikita Mittal, Planning Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the case. Sh. V. Shokeen (AR) and Sh. Harsh Kumar Gupta (AR) are present on behalf of the promoter. Approved as proposed subject to submission of BG/DD of Rs. 25 lakhs each in lieu of submission of fire approval and approved SPE within 4 months along with rectification of other deficiencies. The approval of EC shall be submitted within 2 months as the same is already cleared by SIEAA in Gold rating.
- Home
- RERA Projects
- Gurugram
- The Legacy Phase-I
GGM/861/593/2024/88
RERA overview
As filed by the promoter in Form REP-I with HRERA Gurugram.
- businessPromoter
- Silverglades Homes LLP
- placeLocation
- Village Behrampur, Sector 63A, Gurgaon
- mapTehsil / District
- Wazirabad St, Gurugram
- verifiedRERA status
- Approved and certificate uploaded
- account_balanceAuthority
- HRERA Gurugram
- edit_calendarApplied on
- 11 Jul 2024
- architectureLayout plan approved
- —
- constructionConstruction start
- 01 Sep 2024
- event_availableCompletion date
- 31 May 2031
- workspace_premiumRegistration valid
- 16 Aug 2024 – 31 May 2031
- layersFAR (permissible / proposed)
- 2.21 / 2.08
- paymentsEstimated project cost
- ₹ 823.1 Cr
Licence
Land use 9.95 acres in all
Estimated cost ₹ 823.1 Cr in all
Promoter
- Company
- Silverglades Homes LLP
- Registered office
- 506, 5th Floor Time Square Building, B Block, Sushant Lok Phase 1, Gurgaon – 122002
- CIN
- ABZ9999
Book a free site visit
Latest price, offers and a guided visit of The Legacy Phase-I.
Mr Prashant Agarwal is available to discuss all your queries.
Online now · replies on WhatsApp
Quick questions
Plot sizes
1 sizes · 0 plots registered with RERA. Tap a column to sort.
| Sq yd | Sq ft | Sq m | Plots |
|---|---|---|---|
| 0 | 0 | 0 | 0 |
Areas are as registered with RERA (square metres); square yards and square feet are converted. Final sizes are as per the allotment.
Unit types
341 units in 1 types as registered with RERA.
| Type | Carpet area (sq ft) | Units |
|---|---|---|
| Apartment/Shops/Other Buildings | 1,614 – 4,164 | 341 |
Carpet areas as filed with RERA (square metres, shown in square feet). Booked / unsold are as on the RERA application date.
Facilities & services
15 facilities in the promoter's service plan estimate · ₹ 72.45 Cr budgeted.
-
add_road
Internal Roads and Pavements ₹ 8.05 Cr est.
-
water_drop
Water Supply System ₹ 2.59 Cr est.
-
water
Storm Water Drainage ₹ 2.3 Cr est.
-
bolt
Electricity Supply System ₹ 3.74 Cr est.
-
recycling
Sewage Treatment & Garbage Disposal ₹ 2.88 Cr est.
-
light
Street Lighting ₹ 1.96 Cr est.
-
local_fire_department
Security and Fire Fighting ₹ 2.3 Cr est.
-
park
Playgrounds and Parks ₹ 1.61 Cr est.
-
people
Club House / Community Centre ₹ 25.7 Cr est.
-
wb_sunny
Renewable Energy System ₹ 4.6 Cr est.
-
recycling
Sewage Treatment Plant (STP) ₹ 3.74 Cr est.
-
local_parking
Parking ₹ 2.88 Cr est.
-
water_drop
Underground Water Tank ₹ 2.88 Cr est.
-
water_drop
Rain Water Harvesting ₹ 92 L est.
-
bolt
Electrical Sub Station ₹ 4.6 Cr est.
Also budgeted Any Other · ₹ 1.73 Cr
Not in this filing Shopping Area School Hospital / Dispensary
External connections
- check_circleRoads GMDA, ALREADY EXISTING 60M ROAD ABERTING THE SITE
- check_circleWater Supply GMDA
- check_circleElectricity DHBVN
- check_circleSewage Disposal GMDA
- check_circleStorm Water Drainage GMDA
Specifications
- Flooring Details of Various Parts of House
- COMBINATION OF LAMINATED WOODEN FLOORING , NATURAL STONE &TILES;
- Wall Finishing Details
- COMBINATION OF ACRYLIC EMULSION PAINT , POP PUNNING
- Kitchen Details
- ANTISLIP VITRIFIED TILES;ACRYLIC EMULSION PAINT, GRANITE STONE COUNTER, SINGLE LEVER CP FITTINGS & DOUBLE BOWL SS SINK WITH DRAIN BOARD,HOB AND CHIMNEY, MODULAR KITCHEN CABINETRY
- Bathroom Fittings
- VANITIES WITH MIRROR, SINGLE LEVER CP FITTINGS WITH WASH BASIN & EUROPEAN; WC
- Wood Work Etc
- MODULAR KITCHEN CABINETRY,
- Doors and Windos Frames
- HARDWOOD DOOR FRAME FOR INTERNAL DOORS
- Electric Fittings
- MODULAR SWITCHES
- Conducting and Wiring Details
- UPVC CONDUITING WITH WIRING
- Cupboard Details
- MODULAR KITCHEN
- Water Storage
- OHT AT PROJECT LEVEL
- Lift Details
- 12-18 PERSONS APPROX. EACH LIFT CAPACITY
- External Glazings
- UPVC FRAME / ALUMINIUM FRAME WITH GLASS
- Windows / Glazings
- UPVC FRAME / ALUMINIUM FRAME WITH GLASS
- Doors
- WOODEN PANELLED DOOR/POLISHED VENEER
- Main Doors
- WOODEN PANELLED DOOR/POLISHED VENEER
- Internal Doors
- POLISHED VENEER/ PANELLED/ FLUSH SHUTTER
- Air Conditioning
- RV/SPLIT AC SYSTEM
- Electrical Fittings
- MODULAR SWITCHES
- Cng Pipe Line
- PROVISION
- Provision of Wifi and Broadband Facility
- PROVISION
- External Finishing / Colour Scheme
- HIGH GRADE EXTERNAL PAINT AND STONE
- Internal Finishing
- ACRYLIC EMULSION PAINT ON POP PUNNING, ACRYLIC EMULSION PAINT
- Floor
- NATURAL STONE
- Walls
- ACRYLIC EMULSION PAINT ON POP PUNNING
- Ceiling
- ACRYLIC EMULSION PAINT
- Floor
- LAMINATED WOODEN FLOORING
- Walls
- ACRYLIC EMULSION PAINT ON POP PUNNING
- Ceiling
- ACRYLIC EMULSION PAINT
- Modular Wardrobes
- PROVISION
- Floor
- COMBINATION OF NATURAL STONE /TILES
- Walls
- COMBINATION OF NATURAL STONE /TILES AND ACRYLIC EMULSION PAINT
- Ceiling
- FALSE CEILING PAINTED IN ACRYLIC EMULSION PAINT
- Counters
- STONETOP
- Sanitary Ware / Cp Fittings
- SINGLE LEVER CP FITTING, HEALTH FAUCET, WASH BASINS & WALL HUNG WC
- Fitting / Fixtures
- VANITIES WITH MIRROR, EXHAUST FAN , TOWER RAIL, TOWEL RING, TOILET PAPER HOLDER, ROBE HOOK
- Floor
- LAMINATED WOODEN FLOORING
- Walls
- ACRYLIC EMULSION PAINT ON POP PUNNING
- Ceiling
- ACRYLIC EMULSION PAINT
- Wardrobes
- N.A
- Floor
- COMBINATION OF NATURAL STONE /TILES
- Walls
- COMBINATION OF TILES AND ACRYLIC EMULSION PAINT
- Ceiling
- FALSE CEILING PAINTED IN ACRYLIC EMULSION PAINT
- Counters
- STONETOP
- Sanitary Ware / Cp Fittings
- STONETOP
- Fixtures
- VANITIES WITH MIRROR, EXHAUST FAN , TOWER RAIL, TOWEL RING, TOILET PAPER HOLDER, ROBE HOOK
- Floor
- VITRIFIED TILES
- Walls
- COMBINATION OF TILES AND ACRYLIC EMULSION PAINT
- Ceiling
- ACRYLIC EMULSION PAINT
- Counters
- GRANITE COUNTER
- Fixtures
- CP FITTING & DOUBLE BOWL SS SINK WITH DRAIN BOARD
- Kitchen Appliances
- MODULAR KITCHEN,CABINETRY, HOB & CHIMNEY
- Floor
- VITRIFIED TILES/ANTISKID TILES
- Walls & Ceiling
- ACRYLIC EMULSION PAINT ON THE WALL
- Toilet
- TOILET WITH BASIC CP FITTINGS, WASH BASIN AND SPOUT
- Balcony
- UTILITY BALCONY TO HAVE THE PROVISION OF ELECTRICAL AND WATER CONNECTIVITY
- Floor
- ANTI SKID TILES
- Walls & Ceiling
- PLASTER WITH ACRYLIC EMULSION
- Railings
- COMBINATION OF SS, GLASS & MS
- Fixtures
- LED LIGHTS
Statutory approvals
Approvals declared in Form REP-I Part E.
- verified License Obtained
- verified Building Plan Approval (Br-III) Obtained
- verified Electrical Load Availability Connection Obtained
- verified HUDA Construction Water NOC Obtained
- verified Drinking Water Supply Obtained
- verified Sewage Disposal Obtained
- verified Storm Water Drainage Obtained
- verified NOC Aravali Obtained
- verified Zoning Plan Obtained
- verified Airport Height Clearance Obtained
- verified Forest NOC Obtained
- pending Environment Clearance Applied for but yet to receive
- pending Service Plans and Estimates Yet to file for approval
- pending Fire Scheme Approval Yet to file for approval
- pending Mining Permission Yet to file for approval
Plans filed with RERA
- check_circleLayout plan
- check_circleDemarcation plan
- check_circleZoning plan
- check_circleBuilding plan
- check_circleSite plan
- check_circleFloor plan
- check_circleApartment plans
- check_circleElevation section
- check_circleDetail of permissible FAR
- check_circleDetail of covered area achieved FAR
- check_circleRoads and pavement plan
- check_circleElectricity supply plan
- check_circleWater supply plan
- check_circleSewerage and garbage disposal plan
- check_circleStorm water drainage
- check_circleStreet lighting plan
- check_circleParking plan
RERA documents
70 documents downloaded from the HRERA portal. Opens as PDF.
Plans & layouts
Licence & approvals
CA certificates
Land records
Sale documents
Declarations
Other documents
Hearings & orders
Proceedings recorded by the Authority on this registration.
Development schedule
Planned spend each year, from the promoter's quarterly schedule.
Completion committed to RERA: 31 May 2031.