RERA Registered Group Housing New project

The Dahlias RERA details

R16, DLF 5, Sector 54 Gurugram, Gurugram by DLF Limited
HRERA registration number Valid till 31 Dec 2031
GGM/872/604/2024/99
Registered on 04 Oct 2024 · Project ID RERA-GRG-1690-2024
Certificate
Project area16.49 Acres
Total units421
Project cost₹ 6,186.52 Cr
Completion (RERA)Dec 2031
RERA filing

RERA overview

As filed by the promoter in Form REP-I with HRERA Gurugram.

Promoter
DLF Limited
Location
R16, DLF 5, Sector 54 Gurugram
Tehsil / District
Wazirabad St, Gurugram
RERA status
Approved and certificate uploaded
Authority
HRERA Gurugram
Applied on
09 Aug 2024
Layout plan approved
12 Sep 2024
Construction start
20 Apr 2024
Completion date
31 Dec 2031
Registration valid
04 Oct 2024 – 31 Dec 2031
FAR (permissible / proposed)
1.75 / 1.75
Estimated project cost
₹ 6,186.52 Cr

Licence

License Approve by DTCP vide License No. 129 of 1995, 131 of 1995, 38 of 1996, 39 of 1996, 40 of 1996, 52 of 1996, 53 of 1996, 57 of 1996, 02 of 2002, 04 of 2002, 06 of 2002Town & Country Planning Department, Haryana · promoter is the owner-licensee

Land use 16.49 acres in all

Construction of Roads 10.07 ac61.1%
Land Area to Be Used for Construction of Apartments 3.23 ac19.6%
Parks and Playgrounds 2.47 ac15%
Club House 0.43 ac2.6%
Any Other 0.28 ac1.7%

Estimated cost ₹ 6,186.52 Cr in all

Land ₹ 53.09 Cr0.9%
Infrastructure ₹ 375.8 Cr6.1%
Construction ₹ 5,136.07 Cr83%
EDC, taxes & levies ₹ 621.56 Cr10%

Promoter

Company
DLF Limited
Registered office
3rd Floor, Shopping Mall, Arjun Marg, DLF City, Phase I Gurugram 12202
CIN
L70101HR1963PLC2484
Details are as filed with HRERA (haryanarera.gov.in) and may change after the last update on 13 Oct 2026.

Book a free site visit

Latest price, offers and a guided visit of The Dahlias.

Mr Prashant Agarwal is available to discuss all your queries.

Online now · replies on WhatsApp

Hello! Ask me anything about The Dahlias – prices, floor plans, offers or a free site visit.

Quick questions

Start Chat
Plots

Plot sizes

1 sizes · 0 plots registered with RERA. Tap a column to sort.

Sq yd Sq ft Sq m Plots
0 0 0 0

Areas are as registered with RERA (square metres); square yards and square feet are converted. Final sizes are as per the allotment.

RERA units

Unit types

421 units in 1 types as registered with RERA.

Type Carpet area (sq ft) Units
Apartment/Shops/Other Buildings 5,447 – 3,70,247 421

Carpet areas as filed with RERA (square metres, shown in square feet). Booked / unsold are as on the RERA application date.

Facilities

Facilities & services

7 facilities in the promoter's service plan estimate · ₹ 219.09 Cr budgeted.

  • Internal Roads and Pavements ₹ 138.37 Cr est.
  • Water Supply System ₹ 11.74 Cr est.
  • Storm Water Drainage ₹ 1.67 Cr est.
  • Electricity Supply System ₹ 3.57 Cr est.
  • Sewage Treatment & Garbage Disposal ₹ 1.36 Cr est.
  • Street Lighting ₹ 2.34 Cr est.
  • Playgrounds and Parks ₹ 42.72 Cr est.

Also budgeted Any Other · ₹ 17.33 Cr

Not in this filing Security and Fire Fighting Club House / Community Centre Shopping Area Renewable Energy System School Hospital / Dispensary

External connections

  • Roads GMDA
  • Water Supply GMDA
  • Electricity DHVBN
  • Sewage Disposal GMDA
  • Storm Water Drainage GMDA

Specifications

Flooring Details of Various Parts of House
CONCRETE (M30-M90 AS PER IS-456 IS2185)
Wall Finishing Details
BLOCK WORK
Bathroom Fittings
CP FITTING, WASH BASIN, WC
Doors and Windos Frames
MS/UPVC/AL/WOOD/COMPOSITE MATERIAL
Glass Work
CLEAR/ TINTED/ FROSTED/ COATED
Electric Fittings
LIGHT FIXTURE FOR BALCONIES ONLY
Cupboard Details
NONE
Water Storage
OHT & UGT TANKS
Lift Details
BRANDED MAKE
External Glazings
UPVC/ ALUMINIUM
Windows / Glazings
SAME AS POINT#13
Doors
MS FIRE RATED DOOR
Main Doors
MS DOOR
Internal Doors
HARDWOOD /WOODEN FLUSH DOOR/ MS
Air Conditioning
OUTDOOR UNIT OF VARIABLE REFRIGERANT FLOW (VRF)
Electrical Fittings
SAME AS POINT#8
Cng Pipe Line
GAS PIPELINE PROVISION ONLY
Provision of Wifi and Broadband Facility
PROVISION ONLY
External Finishing / Colour Scheme
EXTERNAL GRADED PAINT
Internal Finishing
BLOCK WORK
Floor
CONCRETE
Walls
BLOCK WORK
Ceiling
CONCRETE SLAB
Floor
CONCRETE
Walls
BLOCKWORK/BRICKWORK
Ceiling
CONCRETE SLAB
Floor
CONCRETE
Walls
BLOCKWORK
Ceiling
CONCRETE SLAB
Counters
NONE
Sanitary Ware / Cp Fittings
CP FITTINGS, WASH BASIN, WC
Floor
CONCRETE
Walls
BLOCKWORK
Ceiling
CONCRETE SLAB
Floor
CONCRETE
Walls
BLOCKWORK
Ceiling
CONCRETE SLAB
Counters
NONE
Sanitary Ware / Cp Fittings
CP FITTINGS, WASH BASIN, WC
Floor
CONCRETE
Walls
BLOCKWORK
Ceiling
CONCRETE SLAB
Fixtures
WATER POINT WITH TAP
Floor
CONCRETE
Walls & Ceiling
BLOCKWORK
Toilet
CP FITTINGS, WASH BASIN, WC
Balcony
CONCRETE
Floor
CONCRETE
Walls & Ceiling
BLOCKWORK
Railings
MS/SS/AL/GLASS
Fixtures
CEILING LED LIGHTS
Approvals

Statutory approvals

Approvals declared in Form REP-I Part E.

  • License Obtained
  • Airport Authority Obtained
  • Aravali NOC Obtained
  • Forest NOC Obtained

Plans filed with RERA

  • Layout plan
  • Demarcation plan
  • Zoning plan
  • Building plan
  • Site plan
  • Floor plan
  • Apartment plans
  • Elevation section
  • Detail of permissible FAR
  • Detail of covered area achieved FAR
  • Roads and pavement plan
  • Electricity supply plan
  • Water supply plan
  • Sewerage and garbage disposal plan
  • Storm water drainage
  • Street lighting plan
  • Parking plan
Documents

RERA documents

114 documents downloaded from the HRERA portal. Opens as PDF.

Other documents

Bs-04 Floor Plan-Basement 4_4_11ZON01 Oct 2024 · 2.8 MB
El-17_3_11ZON01 Oct 2024 · 706 KB
Sc-04_12_11ZON01 Oct 2024 · 2.4 MB
El-03_3_11ZON01 Oct 2024 · 746 KB
El-08_1_11ZON01 Oct 2024 · 868 KB
T2-01_16_11ZON01 Oct 2024 · 3.3 MB
T9-01_1_11ZON01 Oct 2024 · 1.4 MB
El-18_4_11ZON01 Oct 2024 · 800 KB
T2-04_19_11ZON01 Oct 2024 · 2.0 MB
T3-04_23_11ZON01 Oct 2024 · 661 KB
Spe01 Oct 2024 · 92 KB
Bs-05 Area Diagram Basement – 1_5_11ZON01 Oct 2024 · 2.8 MB
T9-01B_3_11ZON01 Oct 2024 · 1.2 MB
El-15_1_11ZON01 Oct 2024 · 791 KB
T1-01_11_11ZON01 Oct 2024 · 3.2 MB
T9-01C_4_11ZON01 Oct 2024 · 413 KB
T9-05_1_11ZON01 Oct 2024 · 913 KB
El-10_3_11ZON01 Oct 2024 · 842 KB
T3-01_20_11ZON01 Oct 2024 · 2.3 MB
T4-03_26_11ZON01 Oct 2024 · 2.1 MB
Sc-10_11_11ZON01 Oct 2024 · 2.7 MB
Sc-06_14_11ZON01 Oct 2024 · 2.6 MB
T8-03_41_11ZON01 Oct 2024 · 3.5 MB
Sc-07_8_11ZON01 Oct 2024 · 2.4 MB
Bs-01 Floor Plan-Basement 1_1_11ZON01 Oct 2024 · 2.9 MB
Bs-03 Floor Plan-Basement 3_3_11ZON01 Oct 2024 · 2.5 MB
T2-02_17_11ZON01 Oct 2024 · 3.6 MB
T1-04_14_11ZON01 Oct 2024 · 2.0 MB
Dr-90201 Oct 2024 · 3.5 MB
Sc-12_13_11ZON01 Oct 2024 · 2.4 MB
Tt-0101 Oct 2024 · 3.4 MB
T1-03_13_11ZON01 Oct 2024 · 3.2 MB
T9-01D_5_11ZON01 Oct 2024 · 617 KB
T9-06_2_11ZON01 Oct 2024 · 969 KB
Ff-90001 Oct 2024 · 4.3 MB
Sc-14_15_11ZON01 Oct 2024 · 2.9 MB
El-16_2_11ZON01 Oct 2024 · 873 KB
T9-01A_2_11ZON01 Oct 2024 · 1.6 MB
El-05_5_11ZON01 Oct 2024 · 791 KB
Sd-0301 Oct 2024 · 2.8 MB
T7-04_38_11ZON01 Oct 2024 · 799 KB
T2-03_18_11ZON01 Oct 2024 · 2.9 MB
T9-03_3_11ZON01 Oct 2024 · 1.1 MB
Bs-02 Floor Plan-Basement 2_2_11ZON01 Oct 2024 · 2.8 MB
Sd-03_10_11ZON01 Oct 2024 · 651 KB
T1-02_12_11ZON01 Oct 2024 · 3.6 MB
T8-04_42_11ZON01 Oct 2024 · 1.5 MB
Bs-07 Area Diagram Basement – 3_7_11ZON01 Oct 2024 · 2.1 MB
Bs-08 Area Diagram Basement – 4_11ZON01 Oct 2024 · 2.2 MB
T9-07_3_11ZON01 Oct 2024 · 659 KB
Sc-01 Section a-a (Tower-1_9_11ZON01 Oct 2024 · 3.0 MB
T9-02_2_11ZON01 Oct 2024 · 1.2 MB
T7-03_37_11ZON01 Oct 2024 · 2.2 MB
T9-04_4_11ZON01 Oct 2024 · 793 KB
Sd-0101 Oct 2024 · 3.6 MB
T4-02_25_11ZON01 Oct 2024 · 2.1 MB
T9-02(1)_1_11ZON01 Oct 2024 · 1.3 MB
El-02 Elevation West (Towe_2_11ZON01 Oct 2024 · 705 KB
Bs-06 Area Diagram Basement – 2_6_11ZON01 Oct 2024 · 2.1 MB
T9-04A_5_11ZON01 Oct 2024 · 1.3 MB
El-09_2_11ZON01 Oct 2024 · 766 KB
El-11_4_11ZON01 Oct 2024 · 850 KB
El-13_6_11ZON01 Oct 2024 · 764 KB
Phasing Plan01 Oct 2024 · 1.6 MB
Dr-90001 Oct 2024 · 4.7 MB
Sc-02_10_11ZON01 Oct 2024 · 2.6 MB
Sc-11_12_11ZON01 Oct 2024 · 2.1 MB
Td-02_4_11ZON01 Oct 2024 · 3.0 MB
Ff-900_9_11ZON01 Oct 2024 · 1.1 MB
T3-02_21_11ZON01 Oct 2024 · 2.2 MB
T4-06_29_11ZON01 Oct 2024 · 1.8 MB
T8-02_40_11ZON01 Oct 2024 · 3.7 MB
Super Imposed Khasra Plan01 Oct 2024 · 4.8 MB
El-14_7_11ZON01 Oct 2024 · 855 KB
Sd-0201 Oct 2024 · 3.6 MB
T3-03_22_11ZON01 Oct 2024 · 2.0 MB
Sc-05_13_11ZON01 Oct 2024 · 3.1 MB
T4-04_27_11ZON01 Oct 2024 · 2.0 MB
CA Estimated01 Oct 2024 · 1.5 MB
El-07_7_11ZON01 Oct 2024 · 867 KB
Td-01_3_11ZON01 Oct 2024 · 2.6 MB
T8-01_39_11ZON01 Oct 2024 · 3.7 MB
El-01 Elevation North (Tow_1_11ZON01 Oct 2024 · 930 KB
El-04_4_11ZON01 Oct 2024 · 857 KB
El-06_6_11ZON01 Oct 2024 · 807 KB
El-12_5_11ZON01 Oct 2024 · 631 KB
Pl-900_8_11ZON01 Oct 2024 · 3.1 MB
Sc-03_11_11ZON01 Oct 2024 · 3.1 MB
Sc-08_9_11ZON01 Oct 2024 · 2.2 MB
Sc-09_10_11ZON01 Oct 2024 · 2.2 MB
Sc-13_14_11ZON01 Oct 2024 · 2.5 MB
T4-01_24_11ZON01 Oct 2024 · 2.0 MB
Dr-901_8_11ZON01 Oct 2024 · 1.1 MB
T4-05_28_11ZON01 Oct 2024 · 1.8 MB
T4-07_30_11ZON01 Oct 2024 · 821 KB
Authority

Hearings & orders

Proceedings recorded by the Authority on this registration.

Approved and ready for certificate issuing process View order

Mr. Shashank Sharma, Associate Engineer Executive and Mr. Ashish Dubey briefed about the facts of the project. Ms. Anjana Bali (AR), Sh. Anish Dham (AR) and Sh. Alok Kumar (AR) and Sh. Nimit Porwal (AR) are present on behalf of the promoter. The AR present on behalf of the promoter stated that the licenses on which promoter has applied for registration u/s 4 of the Act of 2016 are before the enactment of the Act of 2016, i.e., 01.05.2017. However, phasing plan of the above licensed land admeasuring 542.8515 acres has been approved by the DTCP vide memo no ZP-1558/JD(RA)/2024/28702 dated 12.09.2024 and the project under the consideration of the Authority is earmarked as phase “R16” in approved phasing plan and hence each phase is to be considered as a standalone project in terms of section 3(explanation) and 4(c) of the Act of 2016. Further, no development has been undertaken in respect of phase of project under consideration and first building plans was approved by the DTCP only on 27.10.2022 for 7.57 acres on “Zone 10” vide memo no ZP-1558/JD(RA)/2022/32503 and EC for the said parcel of the land was approved only on 17.08.2022. Also, the building plan approved earlier has now been revised by DTCP in the name of M/s DLF Ltd. vide memo no ZP-1558/JD(RA)/2024/29637 dated 19.09.2024 and the various licenses issued in the name of their subsidiary companies merged into M/s Nilgiri Cultivations Pvt. Ltd. on 17.11.2000 and after that it is known as DLF Utilities Ltd. (by certificate for change of name on 23.10.2008). Finally, the real estate business of DLF Utilities Ltd. got demerged and merged into DLF Ltd. vide order dated 23.02.2022 in CP(CAA) No 14/Chd/Hry/2020 passed by NCLT and also the revised BR-III has been issued by DTCP in the name of DLF Limited only. The AR further clarifies that said revisions in building plans is prior to any kind of sale, booking, marketing, advertisement and affidavit to the same has been submitted in the DTCP also and as per the latest policy/order issued by the Town & Country Planning Department on 16.09.2024, it has been clarified that wherein no third-party rights have been created and undertaking to this effect has been submitted, no public notice for inviting objections is required to be issued . Accordingly, revised BR-III has been issued by DTCP without inviting any objections or public notice. So, the project under the consideration of Authority is not categorized as “Ongoing Project” and the late fee calculated by the Authority is not applicable on them, as the project could not have been applied for registration u/s 4 of the Act of 2016 till various approvals are in place while no such approvals were obtained before the commencement of the Act, 2016. However, the Interim RERA had issued the clarification letter to NAREDCO, Haryana vide memo no HRERA/RD/2017/35/1049 dated 15.09.2017 which clarifies that licensed (unlaunched) projects can be registered at any time before the promoter intends to advertise, market, or sell the property. Furthermore, the AR informed that few of the clauses apart from the approved model BBA have to be added for enhanced transparency and better understanding of the project to the proposed allottee. The Authority observes that besides above directions issued by Interim RERA to NAREDCO, the opinion from Ld. AG, Haryana has been taken by the Authority in respect of Group Housing Colony namely “GH 63” located at Sector-63, Gurugram. regarding the ongoing project and applicability of late fee wherein the following has been opined: - “In the opinion of undersigned, the objection raised by the authority is not sustainable in view of the legal position summarized in para 25 because it is not possible to say that as on 01.05.2017, promoter was in a position to start development of project because the building plans were not prepared what to talk of sanctioned. Equally speaking, even without requisite permissions as provided in section 4(2) of Act of 2016, the authority was not in a position to grant registration. There arises no occasion to ask for late fees for late registration of the project because as on 01.05.2017, the project of promoter/applicant could not have been categorized as "ongoing" because with only license for developing group housing colony without even a building plan, the applicant could not have start developing the proposed real estate project.” Therefore, as per above clear opinion of AG, Haryana, the project cannot be categorized as “Ongoing” till approval of first building plans on 27.10.2022 but becomes registrable w.e.f said above. But in view of above directions of Interim RERA to NAREDCO dated 15.09.2017 as well as the fact that no timeline has been specified for making application for registration of project Post RERA cases, a further advice from Government/AG, Haryana is required to adopt a uniform practice. STP, HARERA and Secretary HARERA, to put up the requisite proposal and reference to Government in 10 days and to keep follow up till above clarification and realization of amount, if so advised or decided by Government and an affidavit to this effect shall be taken. The promoter is further directed to submit the model BBA in the Authority along with the conveyance deed and further the proposed additional clauses in the model BBA shall be examined separately on file. The promoter is further directed to submit the approved fire scheme and approved service plans and estimates within 3 months from the date of registration and BG’s of Rs. 25 Lakhs each in lieu of same has been submitted in the Authority. Therefore, as proposed above the registration shall be issued subject to the correction in form A-H and DPI and DD/BG/Affidavit for payment of late fee as per the decision taken by the Government. Further, the amount of late fee is subject to audit and reconciliation as well as conformation/clarification of Govt.

Adjournment View order

Ms. Shashank Sharma, Associate Engineer Executive and Ms. Ashish Dubey, Chartered Accountant briefed about the facts of the project. Sh. Anish Dham (AR) and Sh. Alok Kumar (AR), Sh. Nimit Porwal (AR) are present on behalf of the promoter. The AR present on behalf of the promoter states that initially building plans were approved by DTCP vide memo no ZP-1558/JD(RA)/2022/32503 dated 27.10.2022 which is part of Zone-10 as per the old, approved layout plan and no advertisement, marketing, booking, sale or offer for sale has been made in respect of the proposed project and the affidavit for the same has been submitted in the Authority. Further, phasing plan of the land admeasuring 542.8515 acres has been approved by the DTCP vide memo no ZP-1558/JD(RA)/2024/28702 dated 12.09.2024 and the project under the consideration of the Authority is marked as R16 in approved phasing plan. Also, the building plan approved earlier has been revised by DTCP and its final approval will be submitted to the Authority. The AR further clarifies that said revisions in building plans is prior to any kind of sale, booking, marketing, advertisement and hence no consent of allotees is required. Furter, the EC for the said project has also been revised and approved vide memo no. SEAC/HR/2024/067 dated 14.09.2024. Keeping in view of the above, Authority directs the promoter to submit the revised approved building plans and rectify the other remaining deficiencies as mentioned above. The matter to come up on 30.09.2024.

Examination by authority

The matter is adjourned and to come up on 16.09.2024.

Development

Development schedule

Planned spend each year, from the promoter's quarterly schedule.

2024 ₹ 38.07 Cr
2025 ₹ 435.67 Cr
2026 ₹ 1,831.6 Cr
2027 ₹ 1,938.74 Cr
2028 ₹ 1,210.26 Cr
2029 ₹ 195.26 Cr
2030 ₹ 217.04 Cr
2031 ₹ 106.41 Cr

Completion committed to RERA: 31 Dec 2031.