Ms. Deepika, Planning Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the case. Sh. Gurpal Chawla (Director), Sh. Harshit Batra (Advocate) & Sh. Harpal Chawla are present on behalf of the promoter. Approved as proposed subject to the compliance of the above deficiencies. The requisite rectification in the A-H form and online DPI shall be made before issuance of RC.
- Home
- RERA Projects
- Gurugram
- Trevoc Royal Residences
GGM/863/595/2024/90
RERA overview
As filed by the promoter in Form REP-I with HRERA Gurugram.
- businessPromoter
- JHS Estate Private Limited
- placeLocation
- Sector 56, Urban Estate, Gurgaon II, Haryana
- mapTehsil / District
- Gurgaon, Gurugram
- verifiedRERA status
- Approved and certificate uploaded
- account_balanceAuthority
- HRERA Gurugram
- edit_calendarApplied on
- 01 Aug 2024
- architectureLayout plan approved
- 29 Jul 2024
- constructionConstruction start
- 08 Aug 2024
- event_availableCompletion date
- 06 Feb 2030
- workspace_premiumRegistration valid
- 02 Sep 2024 – 06 Feb 2030
- layersFAR (permissible / proposed)
- 4.12 / 4.12
- paymentsEstimated project cost
- ₹ 589.78 Cr
Licence
Land use 2.06 acres in all
Estimated cost ₹ 589.78 Cr in all
Promoter
- Company
- JHS Estate Private Limited
- Registered office
- Spaze Business Park,Tower B, 3rd & 4th Floor, Sector-66,Gurugram-122018,Haryana
- CIN
- U68100DL2023PTC412322
Book a free site visit
Latest price, offers and a guided visit of Trevoc Royal Residences.
Mr Prashant Agarwal is available to discuss all your queries.
Online now · replies on WhatsApp
Quick questions
Plot sizes
1 sizes · 0 plots registered with RERA. Tap a column to sort.
| Sq yd | Sq ft | Sq m | Plots |
|---|---|---|---|
| 0 | 0 | 0 | 0 |
Areas are as registered with RERA (square metres); square yards and square feet are converted. Final sizes are as per the allotment.
Unit types
86 units in 1 types as registered with RERA.
| Type | Carpet area (sq ft) | Units |
|---|---|---|
| Apartment/Shops/Other Buildings | 1,385 – 3,646 | 86 |
Carpet areas as filed with RERA (square metres, shown in square feet). Booked / unsold are as on the RERA application date.
Facilities & services
13 facilities in the promoter's service plan estimate · ₹ 27.97 Cr budgeted.
-
add_road
Internal Roads and Pavements ₹ 5.66 Cr est.
-
water_drop
Water Supply System ₹ 39.06 L est.
-
water
Storm Water Drainage ₹ 31.25 L est.
-
bolt
Electricity Supply System ₹ 10.41 Cr est.
-
light
Street Lighting ₹ 15 L est.
-
local_fire_department
Security and Fire Fighting ₹ 3.86 Cr est.
-
park
Playgrounds and Parks ₹ 2.87 Cr est.
-
wb_sunny
Renewable Energy System ₹ 31.5 L est.
-
check_circle
Sewerage System ₹ 23.43 L est.
-
recycling
Sewage Treatment Plant (STP) ₹ 55.5 L est.
-
water_drop
Underground Water Tank ₹ 1.41 Cr est.
-
water_drop
Rain Water Harvesting ₹ 23.43 L est.
-
bolt
Electrical Sub Station ₹ 90 L est.
Also budgeted Any Other · ₹ 65.72 L
Not in this filing Sewage Treatment & Garbage Disposal Club House / Community Centre Shopping Area School Hospital / Dispensary
External connections
- radio_button_uncheckedRoads CONNECTED ROADTHROUGH HUDA (APPROVAL NOT REQUIRED)
- check_circleWater Supply HSVP (ASSURANCE GRANTED)
- check_circleElectricity DHBVN
- check_circleSewage Disposal HSVP
- check_circleStorm Water Drainage HSVP (ASSURANCE GRANTED)
Specifications
- Flooring Details of Various Parts of House
- ITALIAN/ IMPORTED MARBLE/ VITRIFIED TILE/LAMINATE WOODEN FLOORING/ ANTISKIDVITRIFIED
- Wall Finishing Details
- PLASTER + DADO UP TO 7FT IN VITRIFIEDTILE(ONLY FOR TOILETS)
- Kitchen Details
- WALLS: PLASTER + DADO ABOVE COUNTERUP TO 2FT HIGH IN VITRIFIED TILE
- Doors and Windos Frames
- HARDWOOD DOOR FRAME WITH FLUSHDOOR/LAMINATE OR SKIN DOOR PANELS
- Glass Work
- UPVC / ALUMINIUM FRAMED SINGLE/DOUBLEGLAZING UNIT AS PER HEAT LOAD AND ASPER DESIGN
- Electric Fittings
- MODULAR SWITCHES AND SOCKETS
- Conducting and Wiring Details
- 1.5 SQMM - 4 SQMM FRLS COPPER WIRING
- External Glazings
- UPVC / ALUMINIUM FRAMED SINGLE/DOUBLEGLAZING UNIT AS PER HEAT LOAD AND ASPER DESIGN
- Windows / Glazings
- UPVC / ALUMINIUM FRAMED SINGLE/DOUBLEGLAZING UNIT AS PER HEAT LOAD AND ASPER DESIGN
- Doors
- WOODEN FRAME WITH FLUSH DOOR WITHVENEER / LAMINATE FINISH (ON BOTH SIDES)& ARCHITRAVES
- Main Doors
- WOODEN FRAME WITH FLUSH DOOR WITHVENEER / LAMINATE FINISH (ON BOTH SIDES)& ARCHITRAVES
- Internal Doors
- WOODEN FRAME WITH FLUSH DOOR WITHVENEER / LAMINATE FINISH (ON BOTH SIDES)& ARCHITRAVES
- Air Conditioning
- VRV / VRF
- Electrical Fittings
- PROVISION ONLY
- Provision of Wifi and Broadband Facility
- THROUGH FTTH SYSTEM
- External Finishing / Colour Scheme
- EXTERIOR GRADE WEATHERSHIELD PAINT
- Internal Finishing
- PUTTY WITH COMBINATION OF OBD AND ACRYLIC EMULSION, PLASTER NOT REQUIRED FOR RCC SURFACES
- Floor
- ITALIAN/IMPORTED MARBLE/VITRIFIED TILE
- Walls
- LOW VOC ACRYLIC EMULSION PAINT PUTTY WITH ACOMBINATION OF OBD AND ACRYLIC EMULSIONPAINT; PLASTER NOT REQUIRED FOR RCC FINISHEDSURFACES
- Ceiling
- LOW VOC ACRYLIC EMULSION PAINT PUTTY WITH ACOMBINATION OF OBD AND ACRYLIC EMULSIONPAINT; PLASTER NOT REQUIRED FOR RCC FINISHEDSURFACES AND PART FALSE CEILING AS PERDESIGN
- Floor
- ITALIAN/IMPORTED MARBLE/VITRIFIED TILE
- Walls
- PUTTY WITH A COMBINATION OF OBD AND ACRYLICEMULSION PAINT; PLASTER NOT REQUIRED FORRCC FINISHED SURFACES
- Ceiling
- PUTTY WITH A COMBINATION OF OBD AND ACRYLICEMULSION PAINT; PLASTER NOT REQUIRED FORRCC FINISHED SURFACES
- Floor
- ANTISKID VITRIFIED / CERAMIC TILES
- Walls
- PLASTER + DADO UP TO 7FT IN VITRIFIED TILE
- Ceiling
- WATER RESISTANT
- Counters
- STONE / ENGINEERED STONE
- Sanitary Ware / Cp Fittings
- EWC, WASH BASIN, SHOWER AND NECESSARY CP FITTINGS
- Floor
- LAMINATE WOODEN FLOORING/VITRIFIED TILES
- Walls
- PUTTY WITH A COMBINATION OF OBD AND ACRYLICEMULSION PAINT; PLASTER NOT REQUIRED FORRCC FINISHED SURFACES
- Ceiling
- PUTTY WITH A COMBINATION OF OBD AND ACRYLICEMULSION PAINT; PLASTER NOT REQUIRED FORRCC FINISHED SURFACES
- Floor
- ANTISKID VITRIFIED / CERAMIC TILES
- Walls
- PLASTER + DADO UP TO 7FT IN VITRIFIED TILE
- Ceiling
- WATER RESISTANT
- Counters
- STONE / ENGINEERED STONE
- Sanitary Ware / Cp Fittings
- EWC, WASH BASIN, SHOWER AND OTHER NECESSARY CP FITTINGS
- Floor
- VITRIFIED TILES
- Walls
- PLASTER + DADO ABOVE COUNTER UP TO 2FT HIGHIN VITRIFIED TILE
- Ceiling
- LOW VOC ACRYLIC EMULSION PAINT/OBD
- Counters
- STONE / ENGINEERED STONE
- Fixtures
- SS SINK AND CP FITTINGS
- Floor
- VITRIFIED / CERAMIC TILES
- Walls & Ceiling
- PUTTY AND PAINT OBD
- Toilet
- ANTISKID CERAMIC TILE IN DADO AND FLOOR
- Balcony
- CERAMIC / VITRIFIED TILES
- Floor
- ANTISKID VITRIFIED TILES
- Walls & Ceiling
- LOW VOC EXTERIOR GRADE WEATHER SHIELDPAINT
- Railings
- GLASS / MS / ALUMINIUM
Statutory approvals
Approvals declared in Form REP-I Part E.
- verified No Objection Certificate for Height Clearance Obtained
- verified Assurance for Drinking Water Supply, Sewerconnection and Storm Water Connection Obtained
- verified NOC for Use of Treated Waste Water Forconstruction Activities Obtained
- verified Grant of Permission for Transfer of TDR Certificates Obtained
- verified Assurance Certificate of DHBVN for Power Supply Obtained
- verified Green Rating for Integrated Habitat Assessment Obtained
- verified Request for Reducing of Minimum Setbacks Obtained
- verified Site Co-Ordinates in Wgs 84 and Site Elevationcertificate Obtained
- verified Tree Cutting Permission Obtained
- verified Approval for No Encroachment on Site, Nolitigation on Site, No Ht Line Passing Over the Site,No Haryana City Gas Distribution Pipeline Passingover or Under the Site, No Effect of Plpa Act Onsite, No Effect of Aravali Notification, No Forestland on Site, No Effect of Natural Conservationzone. Obtained
- verified Site Plans Obtained
- verified Environment Clearance Obtained
- verified Fire Fighting Scheme Obtained
- verified Mining Permission Obtained
Plans filed with RERA
- check_circleLayout plan
- check_circleDemarcation plan
- check_circleZoning plan
- check_circleBuilding plan
- check_circleSite plan
- check_circleFloor plan
- check_circleApartment plans
- check_circleElevation section
- check_circleDetail of permissible FAR
- check_circleDetail of covered area achieved FAR
- radio_button_uncheckedRoads and pavement plan
- radio_button_uncheckedElectricity supply plan
- radio_button_uncheckedWater supply plan
- radio_button_uncheckedSewerage and garbage disposal plan
- radio_button_uncheckedStorm water drainage
- radio_button_uncheckedStreet lighting plan
- radio_button_uncheckedParking plan
RERA documents
56 documents downloaded from the HRERA portal. Opens as PDF.
Plans & layouts
Licence & approvals
CA certificates
Declarations
Other documents
Hearings & orders
Proceedings recorded by the Authority on this registration.
Development schedule
Planned spend each year, from the promoter's quarterly schedule.
Completion committed to RERA: 06 Feb 2030.