Trevoc Royal Residences RERA details

Sector 56, Urban Estate, Gurgaon II, Haryana, Gurugram by JHS Estate Private Limited
HRERA registration number Valid till 06 Feb 2030
GGM/863/595/2024/90
Registered on 02 Sep 2024 · Project ID RERA-GRG-1700-2024
Certificate
Project area2.06 Acres
Total units86
Project cost₹ 589.78 Cr
Completion (RERA)Feb 2030
RERA filing

RERA overview

As filed by the promoter in Form REP-I with HRERA Gurugram.

Promoter
JHS Estate Private Limited
Location
Sector 56, Urban Estate, Gurgaon II, Haryana
Tehsil / District
Gurgaon, Gurugram
RERA status
Approved and certificate uploaded
Authority
HRERA Gurugram
Applied on
01 Aug 2024
Layout plan approved
29 Jul 2024
Construction start
08 Aug 2024
Completion date
06 Feb 2030
Registration valid
02 Sep 2024 – 06 Feb 2030
FAR (permissible / proposed)
4.12 / 4.12
Estimated project cost
₹ 589.78 Cr

Licence

Land allotted by HSVP through LOIEndst No.ZO002/EO018/UE029/LALOT/0000000385Town & Country Planning Department, Haryana · promoter is the owner-licensee

Land use 2.06 acres in all

Land Area to Be Used for Construction of Apartments 0.84 ac41%
Construction of Roads 0.58 ac28.1%
Commercial 0.26 ac12.7%
Parks and Playgrounds 0.2 ac9.7%
Green Belts 0.12 ac6%
Any Other 0.02 ac1.2%
Electricity Sub-Station 0.01 ac0.6%
Rainwaterharvesting 0.01 ac0.4%
Guardroomandbasementandstaircasemumty 0.01 ac0.4%

Estimated cost ₹ 589.78 Cr in all

Land ₹ 149.19 Cr25.3%
Infrastructure ₹ 54.91 Cr9.3%
Construction ₹ 257.39 Cr43.6%
EDC, taxes & levies ₹ 128.28 Cr21.8%

Promoter

Company
JHS Estate Private Limited
Registered office
Spaze Business Park,Tower B, 3rd & 4th Floor, Sector-66,Gurugram-122018,Haryana
CIN
U68100DL2023PTC412322
Details are as filed with HRERA (haryanarera.gov.in) and may change after the last update on 18 Oct 2026.

Book a free site visit

Latest price, offers and a guided visit of Trevoc Royal Residences.

Mr Prashant Agarwal is available to discuss all your queries.

Online now · replies on WhatsApp

Hello! Ask me anything about Trevoc Royal Residences – prices, floor plans, offers or a free site visit.

Quick questions

Start Chat
Plots

Plot sizes

1 sizes · 0 plots registered with RERA. Tap a column to sort.

Sq yd Sq ft Sq m Plots
0 0 0 0

Areas are as registered with RERA (square metres); square yards and square feet are converted. Final sizes are as per the allotment.

RERA units

Unit types

86 units in 1 types as registered with RERA.

Type Carpet area (sq ft) Units
Apartment/Shops/Other Buildings 1,385 – 3,646 86

Carpet areas as filed with RERA (square metres, shown in square feet). Booked / unsold are as on the RERA application date.

Facilities

Facilities & services

13 facilities in the promoter's service plan estimate · ₹ 27.97 Cr budgeted.

  • Internal Roads and Pavements ₹ 5.66 Cr est.
  • Water Supply System ₹ 39.06 L est.
  • Storm Water Drainage ₹ 31.25 L est.
  • Electricity Supply System ₹ 10.41 Cr est.
  • Street Lighting ₹ 15 L est.
  • Security and Fire Fighting ₹ 3.86 Cr est.
  • Playgrounds and Parks ₹ 2.87 Cr est.
  • Renewable Energy System ₹ 31.5 L est.
  • Sewerage System ₹ 23.43 L est.
  • Sewage Treatment Plant (STP) ₹ 55.5 L est.
  • Underground Water Tank ₹ 1.41 Cr est.
  • Rain Water Harvesting ₹ 23.43 L est.
  • Electrical Sub Station ₹ 90 L est.

Also budgeted Any Other · ₹ 65.72 L

Not in this filing Sewage Treatment & Garbage Disposal Club House / Community Centre Shopping Area School Hospital / Dispensary

External connections

  • Roads CONNECTED ROADTHROUGH HUDA (APPROVAL NOT REQUIRED)
  • Water Supply HSVP (ASSURANCE GRANTED)
  • Electricity DHBVN
  • Sewage Disposal HSVP
  • Storm Water Drainage HSVP (ASSURANCE GRANTED)

Specifications

Flooring Details of Various Parts of House
ITALIAN/ IMPORTED MARBLE/ VITRIFIED TILE/LAMINATE WOODEN FLOORING/ ANTISKIDVITRIFIED
Wall Finishing Details
PLASTER + DADO UP TO 7FT IN VITRIFIEDTILE(ONLY FOR TOILETS)
Kitchen Details
WALLS: PLASTER + DADO ABOVE COUNTERUP TO 2FT HIGH IN VITRIFIED TILE
Doors and Windos Frames
HARDWOOD DOOR FRAME WITH FLUSHDOOR/LAMINATE OR SKIN DOOR PANELS
Glass Work
UPVC / ALUMINIUM FRAMED SINGLE/DOUBLEGLAZING UNIT AS PER HEAT LOAD AND ASPER DESIGN
Electric Fittings
MODULAR SWITCHES AND SOCKETS
Conducting and Wiring Details
1.5 SQMM - 4 SQMM FRLS COPPER WIRING
External Glazings
UPVC / ALUMINIUM FRAMED SINGLE/DOUBLEGLAZING UNIT AS PER HEAT LOAD AND ASPER DESIGN
Windows / Glazings
UPVC / ALUMINIUM FRAMED SINGLE/DOUBLEGLAZING UNIT AS PER HEAT LOAD AND ASPER DESIGN
Doors
WOODEN FRAME WITH FLUSH DOOR WITHVENEER / LAMINATE FINISH (ON BOTH SIDES)& ARCHITRAVES
Main Doors
WOODEN FRAME WITH FLUSH DOOR WITHVENEER / LAMINATE FINISH (ON BOTH SIDES)& ARCHITRAVES
Internal Doors
WOODEN FRAME WITH FLUSH DOOR WITHVENEER / LAMINATE FINISH (ON BOTH SIDES)& ARCHITRAVES
Air Conditioning
VRV / VRF
Electrical Fittings
PROVISION ONLY
Provision of Wifi and Broadband Facility
THROUGH FTTH SYSTEM
External Finishing / Colour Scheme
EXTERIOR GRADE WEATHERSHIELD PAINT
Internal Finishing
PUTTY WITH COMBINATION OF OBD AND ACRYLIC EMULSION, PLASTER NOT REQUIRED FOR RCC SURFACES
Floor
ITALIAN/IMPORTED MARBLE/VITRIFIED TILE
Walls
LOW VOC ACRYLIC EMULSION PAINT PUTTY WITH ACOMBINATION OF OBD AND ACRYLIC EMULSIONPAINT; PLASTER NOT REQUIRED FOR RCC FINISHEDSURFACES
Ceiling
LOW VOC ACRYLIC EMULSION PAINT PUTTY WITH ACOMBINATION OF OBD AND ACRYLIC EMULSIONPAINT; PLASTER NOT REQUIRED FOR RCC FINISHEDSURFACES AND PART FALSE CEILING AS PERDESIGN
Floor
ITALIAN/IMPORTED MARBLE/VITRIFIED TILE
Walls
PUTTY WITH A COMBINATION OF OBD AND ACRYLICEMULSION PAINT; PLASTER NOT REQUIRED FORRCC FINISHED SURFACES
Ceiling
PUTTY WITH A COMBINATION OF OBD AND ACRYLICEMULSION PAINT; PLASTER NOT REQUIRED FORRCC FINISHED SURFACES
Floor
ANTISKID VITRIFIED / CERAMIC TILES
Walls
PLASTER + DADO UP TO 7FT IN VITRIFIED TILE
Ceiling
WATER RESISTANT
Counters
STONE / ENGINEERED STONE
Sanitary Ware / Cp Fittings
EWC, WASH BASIN, SHOWER AND NECESSARY CP FITTINGS
Floor
LAMINATE WOODEN FLOORING/VITRIFIED TILES
Walls
PUTTY WITH A COMBINATION OF OBD AND ACRYLICEMULSION PAINT; PLASTER NOT REQUIRED FORRCC FINISHED SURFACES
Ceiling
PUTTY WITH A COMBINATION OF OBD AND ACRYLICEMULSION PAINT; PLASTER NOT REQUIRED FORRCC FINISHED SURFACES
Floor
ANTISKID VITRIFIED / CERAMIC TILES
Walls
PLASTER + DADO UP TO 7FT IN VITRIFIED TILE
Ceiling
WATER RESISTANT
Counters
STONE / ENGINEERED STONE
Sanitary Ware / Cp Fittings
EWC, WASH BASIN, SHOWER AND OTHER NECESSARY CP FITTINGS
Floor
VITRIFIED TILES
Walls
PLASTER + DADO ABOVE COUNTER UP TO 2FT HIGHIN VITRIFIED TILE
Ceiling
LOW VOC ACRYLIC EMULSION PAINT/OBD
Counters
STONE / ENGINEERED STONE
Fixtures
SS SINK AND CP FITTINGS
Floor
VITRIFIED / CERAMIC TILES
Walls & Ceiling
PUTTY AND PAINT OBD
Toilet
ANTISKID CERAMIC TILE IN DADO AND FLOOR
Balcony
CERAMIC / VITRIFIED TILES
Floor
ANTISKID VITRIFIED TILES
Walls & Ceiling
LOW VOC EXTERIOR GRADE WEATHER SHIELDPAINT
Railings
GLASS / MS / ALUMINIUM
Approvals

Statutory approvals

Approvals declared in Form REP-I Part E.

  • No Objection Certificate for Height Clearance Obtained
  • Assurance for Drinking Water Supply, Sewerconnection and Storm Water Connection Obtained
  • NOC for Use of Treated Waste Water Forconstruction Activities Obtained
  • Grant of Permission for Transfer of TDR Certificates Obtained
  • Assurance Certificate of DHBVN for Power Supply Obtained
  • Green Rating for Integrated Habitat Assessment Obtained
  • Request for Reducing of Minimum Setbacks Obtained
  • Site Co-Ordinates in Wgs 84 and Site Elevationcertificate Obtained
  • Tree Cutting Permission Obtained
  • Approval for No Encroachment on Site, Nolitigation on Site, No Ht Line Passing Over the Site,No Haryana City Gas Distribution Pipeline Passingover or Under the Site, No Effect of Plpa Act Onsite, No Effect of Aravali Notification, No Forestland on Site, No Effect of Natural Conservationzone. Obtained
  • Site Plans Obtained
  • Environment Clearance Obtained
  • Fire Fighting Scheme Obtained
  • Mining Permission Obtained

Plans filed with RERA

  • Layout plan
  • Demarcation plan
  • Zoning plan
  • Building plan
  • Site plan
  • Floor plan
  • Apartment plans
  • Elevation section
  • Detail of permissible FAR
  • Detail of covered area achieved FAR
  • Roads and pavement plan
  • Electricity supply plan
  • Water supply plan
  • Sewerage and garbage disposal plan
  • Storm water drainage
  • Street lighting plan
  • Parking plan
Documents

RERA documents

56 documents downloaded from the HRERA portal. Opens as PDF.

Other documents

Tower a and B Elevation a04 Sep 2024 · 3.9 MB
Tower a – Lower Pent House Floor Plan and Area Diagram04 Sep 2024 · 4.7 MB
Environment Clearance04 Sep 2024 · 2.7 MB
Bank Undertaking04 Sep 2024 · 442 KB
4th Floor Commercial and Area Diagram04 Sep 2024 · 4.6 MB
Podium 3 – 3rd Floor Plan and Area Diagram04 Sep 2024 · 3.9 MB
Superimposed Plan04 Sep 2024 · 882 KB
Tower a and B Section B04 Sep 2024 · 3.3 MB
Terrace and Roof Plan04 Sep 2024 · 2.9 MB
Airport Height Clearance04 Sep 2024 · 496 KB
Mining Permission04 Sep 2024 · 118 KB
Non Applicability of Power Line Shifting04 Sep 2024 · 53 KB
Sale Deed of the Land04 Sep 2024 · 803 KB
Podium 1 – 1st Floor Plan and Area Diagram04 Sep 2024 · 4.0 MB
Type a and Type B Unit Plan04 Sep 2024 · 4.5 MB
Type C and Type D Unit Plan04 Sep 2024 · 2.3 MB
Type E Unit Plan04 Sep 2024 · 2.3 MB
Tower a – Upper Pent House Floor Plan and Area Diagram04 Sep 2024 · 4.6 MB
Tower a and B Section C04 Sep 2024 · 2.5 MB
Superimposed Plan04 Sep 2024 · 882 KB
Non Applicability of Ncz04 Sep 2024 · 52 KB
Fire Fighting04 Sep 2024 · 124 KB
Various Approvals04 Sep 2024 · 388 KB
Ground Floor Plan (Loby and Commercial) and Area Diagram and Ground Coverage04 Sep 2024 · 2.2 MB
Tower a and B Section a04 Sep 2024 · 2.9 MB
Tower a – Service Floor04 Sep 2024 · 3.2 MB
Tower a – Floor Plan 6th – 14th Floor04 Sep 2024 · 4.8 MB
Tree Cutting Permission04 Sep 2024 · 1.5 MB
5th Floor Plan04 Sep 2024 · 3.4 MB
Basement Plan 01 – Plan and Area Diagram04 Sep 2024 · 3.8 MB
Basement Plan 02 – Plan and Area Diagram04 Sep 2024 · 3.2 MB
Podium 2 – 2nd Floor Plan and Area Diagram04 Sep 2024 · 4.0 MB
Tower a and B Elevation B04 Sep 2024 · 4.0 MB
Tower a – Floor 15 and 24 and Area Diagram04 Sep 2024 · 4.7 MB
Authority

Hearings & orders

Proceedings recorded by the Authority on this registration.

Approved and ready for certificate issuing process View order

Ms. Deepika, Planning Executive and Sh. Ashish Dubey, Chartered Accountant briefed about the facts of the case. Sh. Gurpal Chawla (Director), Sh. Harshit Batra (Advocate) & Sh. Harpal Chawla are present on behalf of the promoter. Approved as proposed subject to the compliance of the above deficiencies. The requisite rectification in the A-H form and online DPI shall be made before issuance of RC.

Development

Development schedule

Planned spend each year, from the promoter's quarterly schedule.

2024 ₹ 17.33 Cr
2025 ₹ 75.89 Cr
2026 ₹ 102.19 Cr
2027 ₹ 112.69 Cr
2028 ₹ 68.69 Cr
2029 ₹ 31.17 Cr
2030 ₹ 5.11 Cr

Completion committed to RERA: 06 Feb 2030.