Sh. Ashish Kush, Planning Executive and Ms. Asha, Chartered Accountant briefed about the facts of the case. Sh. SK Kaushik (AR), Sh, Ajay Gupta (AR) and Sh. Mukesh Tripathi (AR) are present on behalf of the promoter. Regarding the provisioning of services, HSIIDC vide letter dated 14.11.2024 has intimated that water and sewerage connection etc. will be supplied after completion of infrastructure services expected up to 30.04.2026. Approved as proposed subject to correction in A-H form, Online DPI and submission of BG/DD amounting to Rs. 25 lakhs as a security amount in lieu of submission of Approved Environment Clearance within 4 months from the grant of registration certificate. The promoter shall submit the mining permission before start of construction. The Registration Certificate shall be issued after submission of correction in A-H form, Online DPI and BG/DD of Rs. 25 lakhs for submission of Approved Environment Clearance.
- Home
- RERA Projects
- Gurugram
- Elaira Residences Phase-1
GGM/917/649/2025/20
RERA overview
As filed by the promoter in Form REP-I with HRERA Gurugram.
- businessPromoter
- Conscient Infrastructure Private Limited
- placeLocation
- Village Naurangpur, Sector-80
- mapTehsil / District
- Manesar, Gurugram
- verifiedRERA status
- Approved and certificate uploaded
- account_balanceAuthority
- HRERA Gurugram
- edit_calendarApplied on
- 23 Jan 2025
- architectureLayout plan approved
- 17 Jan 2025
- constructionConstruction start
- 01 Sep 2025
- event_availableCompletion date
- 31 Dec 2031
- workspace_premiumRegistration valid
- 20 Feb 2025 – 31 Mar 2031
- layersFAR (permissible / proposed)
- 1.9 / 1.86
- paymentsEstimated project cost
- ₹ 710.61 Cr
Licence
Land use 0 acres in all
Estimated cost ₹ 710.61 Cr in all
Promoter
- Company
- Conscient Infrastructure Private Limited
- Registered office
- 10th Floor Global Business Park, Tower D, MG Road, Gurugram-122002
- CIN
- U74899DL1990PTC039324
Book a free site visit
Latest price, offers and a guided visit of Elaira Residences Phase-1.
Mr Prashant Agarwal is available to discuss all your queries.
Online now · replies on WhatsApp
Quick questions
Plot sizes
1 sizes · 0 plots registered with RERA. Tap a column to sort.
| Sq yd | Sq ft | Sq m | Plots |
|---|---|---|---|
| 0 | 0 | 0 | 0 |
Areas are as registered with RERA (square metres); square yards and square feet are converted. Final sizes are as per the allotment.
Unit types
268 units in 1 types as registered with RERA.
| Type | Carpet area (sq ft) | Units |
|---|---|---|
| Apartment/Shops/Other Buildings | 1,125 – 1,492 | 268 |
Carpet areas as filed with RERA (square metres, shown in square feet). Booked / unsold are as on the RERA application date.
Facilities & services
10 facilities in the promoter's service plan estimate · ₹ 34.79 Cr budgeted.
-
add_road
Internal Roads and Pavements ₹ 1.95 Cr est.
-
water_drop
Water Supply System ₹ 3.17 Cr est.
-
water
Storm Water Drainage ₹ 35.91 L est.
-
bolt
Electricity Supply System ₹ 48 L est.
-
recycling
Sewage Treatment & Garbage Disposal ₹ 38.78 L est.
-
light
Street Lighting ₹ 21.48 L est.
-
local_fire_department
Security and Fire Fighting ₹ 32.8 L est.
-
park
Playgrounds and Parks ₹ 5.6 L est.
-
people
Club House / Community Centre ₹ 27.24 Cr est.
-
wb_sunny
Renewable Energy System ₹ 60 L est.
Not in this filing Shopping Area School Hospital / Dispensary
External connections
- check_circleRoads ALREADY CONNECTED
- check_circleWater Supply HSIIDC/IMT/ESTATE/2024/1295
- check_circleElectricity HSIIDC/ENGG./IMT/25/ 3788
- check_circleSewage Disposal HSIIDC/IMT/ESTATE/2024/1295
- check_circleStorm Water Drainage HSIIDC/IMT/ESTATE/2024/1295
Specifications
- Flooring Details of Various Parts of House
- MARBLE/ PREMIUM QUALITY TILES/ EQUIVALENT
- Wall Finishing Details
- PAINT SURFACE
- Kitchen Details
- FLOOR TILES & PAINT
- Bathroom Fittings
- STANDARD CP FITTING + WC+WASHBASIN
- Wood Work Etc
- FLUSH FLOOR
- Doors and Windos Frames
- DOUBLE/SINGLE GLASS
- Electric Fittings
- LED FIXTURES
- Conducting and Wiring Details
- FRLS INSULTATED COPPER CONDUCTOR WIRE
- Water Storage
- WATER TANK UG/OH
- Lift Details
- PASSENGER/SERVICE/FIREMAN LIFT
- Windows / Glazings
- ALUMINIUM/ UPVC/ EQUIVALENT
- Main Doors
- FLUSH DOOR
- Internal Doors
- BOTH SIDE LAMINATED
- Air Conditioning
- VRV SYSTEM
- Electrical Fittings
- LED FIXTURES
- External Finishing / Colour Scheme
- TEXTURE PAINT
- Internal Finishing
- PAINT SURFACE
- Floor
- STONE/TILE/EQUIVALENT
- Walls
- PAINT/EQUIVALENT
- Ceiling
- PAINT/EQUIVALENT
- Floor
- WOODEN/TILE/EQUIVALENT
- Walls
- PAINT/EQUIVALENT
- Ceiling
- PAINT/EQUIVALENT
- Floor
- TILE/EQUIVALENT
- Walls
- TILE/EQUIVALENT
- Ceiling
- PAINT/EQUIVALENT
- Counters
- STANDARD FIXTURE
- Sanitary Ware / Cp Fittings
- STANDARD FIXTURE
- Fitting / Fixtures
- STANDARD FIXTURE
- Floor
- WOODEN/TILE/EQUIVALENT
- Walls
- PAINT/EQUIVALENT
- Ceiling
- PAINT/EQUIVALENT
- Floor
- TILE/EQUIVALENT
- Walls
- TILE/EQUIVALENT
- Ceiling
- PAINT/EQUIVALENT
- Sanitary Ware / Cp Fittings
- STANDARD FIXTURE
- Fixtures
- STANDARD
- Floor
- TILE/EQUIVALENT
- Walls
- PAINT/EQUIVALENT
- Ceiling
- PAINT/EQUIVALENT
- Fixtures
- STANDARD
- Floor
- TILE/EQUIVALENT
- Walls & Ceiling
- PAINT/EQUIVALENT
- Toilet
- PAINT/EQUIVALENT
- Balcony
- TILE/EQUIVALENT
- Floor
- STANDARD
- Walls & Ceiling
- STANDARD
- Railings
- STANDARD
- Fixtures
- STANDARD
Statutory approvals
Approvals declared in Form REP-I Part E.
- verified Electricity Load Availability Obtained
- verified Storm Water Drainage Obtained
- verified Zoning Plan Approval Obtained
- verified Forest NOC Obtained
- verified Water Supply Obtained
- verified Sewage Disposal Obtained
Plans filed with RERA
- check_circleLayout plan
- check_circleDemarcation plan
- check_circleZoning plan
- check_circleBuilding plan
- check_circleSite plan
- check_circleFloor plan
- check_circleApartment plans
- check_circleElevation section
- check_circleDetail of permissible FAR
- check_circleDetail of covered area achieved FAR
- check_circleRoads and pavement plan
- check_circleElectricity supply plan
- check_circleWater supply plan
- check_circleSewerage and garbage disposal plan
- check_circleStorm water drainage
- check_circleStreet lighting plan
- check_circleParking plan
RERA documents
63 documents downloaded from the HRERA portal. Opens as PDF.
Plans & layouts
Licence & approvals
CA certificates
Financials
Other documents
Hearings & orders
Proceedings recorded by the Authority on this registration.
Development schedule
Planned spend each year, from the promoter's quarterly schedule.
Completion committed to RERA: 31 Dec 2031.