First hearing
- Home
- RERA Projects
- Gurugram
- Urban Resort Phase 4
GGM/949/681/2025/52
RERA overview
As filed by the promoter in Form REP-I with HRERA Gurugram.
- businessPromoter
- Whiteland Corporation Pvt Ltd
- placeLocation
- Revenue Estate of Dhanwapur, Sector 103, Gurugram
- mapTehsil / District
- Gurgaon, Gurugram
- verifiedRERA status
- Approved and certificate uploaded
- account_balanceAuthority
- HRERA Gurugram
- edit_calendarApplied on
- 15 Apr 2025
- architectureLayout plan approved
- 08 Apr 2025
- constructionConstruction start
- 10 May 2025
- event_availableCompletion date
- 31 Dec 2032
- workspace_premiumRegistration valid
- —
- layersFAR (permissible / proposed)
- 3.99 / 3.99
- paymentsEstimated project cost
- ₹ 1,641.62 Cr
Licence
Land use 19.23 acres in all
Estimated cost ₹ 1,641.62 Cr in all
Promoter
- Company
- Whiteland Corporation Pvt Ltd
- Registered office
- Worldmark Gurgaon, Unit No 1001, 10th Floor, Sector-65, Gurgaon
- CIN
- U70109HR2021PTC092905
Book a free site visit
Latest price, offers and a guided visit of Urban Resort Phase 4.
Mr Prashant Agarwal is available to discuss all your queries.
Online now · replies on WhatsApp
Quick questions
Plot sizes
1 sizes · 0 plots registered with RERA. Tap a column to sort.
| Sq yd | Sq ft | Sq m | Plots |
|---|---|---|---|
| 0 | 0 | 0 | 0 |
Areas are as registered with RERA (square metres); square yards and square feet are converted. Final sizes are as per the allotment.
Unit types
352 units in 1 types as registered with RERA.
| Type | Carpet area (sq ft) | Units |
|---|---|---|
| Apartment/Shops/Other Buildings | 1,969 – 2,211 | 352 |
Carpet areas as filed with RERA (square metres, shown in square feet). Booked / unsold are as on the RERA application date.
Facilities & services
15 facilities in the promoter's service plan estimate · ₹ 81.04 Cr budgeted.
-
add_road
Internal Roads and Pavements ₹ 4.85 Cr est.
-
water_drop
Water Supply System ₹ 71 L est.
-
water
Storm Water Drainage ₹ 1.56 Cr est.
-
bolt
Electricity Supply System ₹ 21.4 Cr est.
-
recycling
Sewage Treatment & Garbage Disposal ₹ 1.89 Cr est.
-
light
Street Lighting ₹ 58 L est.
-
local_fire_department
Security and Fire Fighting ₹ 1.15 Cr est.
-
park
Playgrounds and Parks ₹ 13.48 Cr est.
-
wb_sunny
Renewable Energy System ₹ 1.24 Cr est.
-
bolt
Electrical Sub Station ₹ 17.58 Cr est.
-
water_drop
Rain Water Harvesting ₹ 77 L est.
-
add_road
Construction of Circulation Road ₹ 9.57 Cr est.
-
local_parking
Parking ₹ 3.53 Cr est.
-
recycling
Sewage Treatment Plant (STP) ₹ 1.5 Cr est.
-
water_drop
Underground Water Tank ₹ 1.24 Cr est.
Not in this filing Club House / Community Centre Shopping Area School Hospital / Dispensary
External connections
- radio_button_uncheckedRoads CONNECTED
- check_circleWater Supply GMDA
- check_circleElectricity DHBVN
- check_circleSewage Disposal GMDA
- check_circleStorm Water Drainage GMDA
Specifications
- Flooring Details of Various Parts of House
- VITRIFIED TILE, LAMINATE WOODEN FLOORING
- Wall Finishing Details
- PREMIUM ACRYLIC DISTEMPER
- Kitchen Details
- SINGLE LEVER COUNTER TOP
- Bathroom Fittings
- CHINAWARE , SINGLE LEVER COUNTER TOP
- Wood Work Etc
- NO
- Doors and Windos Frames
- FULL HEIGHT WINDOWS- ALUMINIUM PODER COATED SECTIONS AND WOODEN FRAME WITH FLUSH DOOR WITH VENEER FINISH (ON BOTH SIDES) & ARCHITRAVES
- Glass Work
- FULL HEIGHT WINDOWS- ALUMINIUM PODER COATED SECTIONS
- Electric Fittings
- FAN AND ELECTRIC POINT
- Conducting and Wiring Details
- HEAVY DUTY , MODULAR
- Water Storage
- YES
- External Glazings
- 12 MM TOUGHNED GLASS DOOR
- Windows / Glazings
- FULL HEIGHT WINDOWS- ALUMINIUM PODER COATED SECTIONS
- Doors
- WOODEN FRAME WITH FLUSH DOOR WITH LAMINATE FINISH (ON BOTH SIDES) & ARCHITRAVES
- Main Doors
- WOODEN FRAME WITH FLUSH DOOR WITH LAMINATE FINISH (ON BOTH SIDES) & ARCHITRAVES
- Internal Doors
- WOODEN FRAME WITH FLUSH DOOR WITH LAMINATE FINISH (ON BOTH SIDES) & ARCHITRAVES
- Air Conditioning
- VARIABLE RATE FLOW SYSTEM
- Electrical Fittings
- HEAVY DUTY CONDUTING MODULAR SWITCHES, C CURVE MCB
- Cng Pipe Line
- YES
- External Finishing / Colour Scheme
- EXTERNAL GRADE TEXTURE PAINT
- Internal Finishing
- PREMIUM ACRYLIC DISTEMPER
- Floor
- VITRIFIED TILE
- Walls
- PREMIUM ACRYLIC DISTEMPER
- Ceiling
- PREMIUM ACRYLIC DISTEMPER
- Floor
- LAMINATE WOODEN FLOORING
- Walls
- PREMIUM ACRYLIC DISTEMPER
- Ceiling
- PREMIUM ACRYLIC DISTEMPER
- Floor
- VITRIFIED TIL
- Walls
- PREMIUM ACRYLIC DISTEMPER
- Ceiling
- PREMIUM ACRYLIC DISTEMPER
- Counters
- SINGLE LEVER COUNTER TOP
- Sanitary Ware / Cp Fittings
- SINGLE LEVER COUNTER TOP
- Fitting / Fixtures
- SINGLE LEVER COUNTER TOP
- Floor
- VITRIFIED TILE
- Walls
- PREMIUM ACRYLIC DISTEMPER
- Ceiling
- PREMIUM ACRYLIC DISTEMPER
- Floor
- VITRIFIED TILE
- Walls
- PREMIUM ACRYLIC DISTEMPER
- Ceiling
- PREMIUM ACRYLIC DISTEMPER
- Counters
- SINGLE LEVER COUNTER TOP
- Sanitary Ware / Cp Fittings
- SINGLE LEVER COUNTER TOP
- Fixtures
- SINGLE LEVER COUNTER TOP
- Floor
- VITRIFIED TILE
- Walls
- PREMIUM ACRYLIC DISTEMPER
- Ceiling
- PREMIUM ACRYLIC DISTEMPER
- Counters
- SINGLE LEVER COUNTER TOP
- Fixtures
- SINGLE LEVER COUNTER TOP
- Floor
- VITRIFIED TILE
- Walls & Ceiling
- PREMIUM ACRYLIC DISTEMPER
- Toilet
- SINGLE LEVER COUNTER TOP
- Balcony
- IRON ROD
- Floor
- VITRIFIED TILE
- Walls & Ceiling
- PREMIUM ACRYLIC DISTEMPER
- Railings
- IRON ROD
- Fixtures
- SINGLE LEVER COUNTER TOP
Statutory approvals
Approvals declared in Form REP-I Part E.
- verified EC Obtained
Plans filed with RERA
- check_circleLayout plan
- check_circleDemarcation plan
- check_circleZoning plan
- check_circleBuilding plan
- check_circleSite plan
- check_circleFloor plan
- check_circleApartment plans
- check_circleElevation section
- check_circleDetail of permissible FAR
- check_circleDetail of covered area achieved FAR
- check_circleRoads and pavement plan
- check_circleElectricity supply plan
- check_circleWater supply plan
- check_circleSewerage and garbage disposal plan
- check_circleStorm water drainage
- check_circleStreet lighting plan
- check_circleParking plan
RERA documents
6 documents downloaded from the HRERA portal. Opens as PDF.
Plans & layouts
Licence & approvals
CA certificates
Hearings & orders
Proceedings recorded by the Authority on this registration.
Development schedule
Planned spend each year, from the promoter's quarterly schedule.
Completion committed to RERA: 31 Dec 2032.
Urban Resort Phase 4
Share your details and our expert will call you back.
- check_circle Free site visit
- check_circle Best price assistance
- check_circle Home loan help