Skip to content
Authorized Channel Partner Agency RERA ID: RC/REA/HARERA/GGM/2408/2003/2024/121 zinfo@zricks.com
Zricks.com Authorized Channel Partner
  1. Home
  2. RERA Projects
  3. Gurugram
  4. Urban Resort Phase 6
RERA Registered Group Housing New project

Urban Resort Phase 6 RERA details

Revenue Estate of Dhanwapur, Sector 103, Gurugram, Gurugram by Whiteland Corporation Pvt. Ltd.
HRERA registration number
GGM/950/682/2025/53
Registered on 16 May 2025 · Project ID RERA-GRG-1936-2025
Certificate
Project area19.23 Acres
Total units274
Project cost₹ 46.83 Cr
Completion (RERA)Dec 2032
RERA filing

RERA overview

As filed by the promoter in Form REP-I with HRERA Gurugram.

Promoter
Whiteland Corporation Pvt. Ltd.
Location
Revenue Estate of Dhanwapur, Sector 103, Gurugram
Tehsil / District
Gurgaon, Gurugram
RERA status
Approved and certificate uploaded
Authority
HRERA Gurugram
Applied on
18 Apr 2025
Layout plan approved
08 Apr 2025
Construction start
10 May 2025
Completion date
31 Dec 2032
Registration valid
—
FAR (permissible / proposed)
3.99 / 3.99
Estimated project cost
₹ 46.83 Cr

Licence

License No. 263 of 2023 and 158 of 2024Town & Country Planning Department, Haryana · promoter is the owner-licensee

Land use 19.23 acres in all

Land Area to Be Used for Construction of Apartments 0.55 ac2.8%
Green Belts 0.24 ac1.3%
Any Other 0.04 ac0.2%
Construction of Roads 0.01 ac0.1%
Rainwater 0 ac0%
Pavements 0 ac0%

Estimated cost ₹ 46.83 Cr in all

Land ₹ 12.11 Cr25.9%
Infrastructure ₹ 4.15 Cr8.9%
Construction ₹ 22.37 Cr47.8%
EDC, taxes & levies ₹ 8.21 Cr17.5%

Promoter

Company
Whiteland Corporation Pvt. Ltd.
Registered office
Worldmark Gurgaon, Unit No. 1001, 10th Floor, Sector 65, Gurgaon
CIN
U70109HR2021PTC092905
Details are as filed with HRERA (haryanarera.gov.in) and may change after the last update on 14 Oct 2026.

Book a free site visit

Latest price, offers and a guided visit of Urban Resort Phase 6.

Mr Prashant Agarwal is available to discuss all your queries.

Online now · replies on WhatsApp

Hello! Ask me anything about Urban Resort Phase 6 – prices, floor plans, offers or a free site visit.

Quick questions

Start Chat
Plots

Plot sizes

1 sizes · 0 plots registered with RERA. Tap a column to sort.

Sq yd Sq ft Sq m Plots
0 0 0 0

Areas are as registered with RERA (square metres); square yards and square feet are converted. Final sizes are as per the allotment.

RERA units

Unit types

274 units in 1 types as registered with RERA.

Type Carpet area (sq ft) Units
Apartment/Shops/Other Buildings 200 – 9,579 274

Carpet areas as filed with RERA (square metres, shown in square feet). Booked / unsold are as on the RERA application date.

Facilities

Facilities & services

16 facilities in the promoter's service plan estimate · ₹ 5.5 Cr budgeted.

  • Internal Roads and Pavements ₹ 18.22 L est.
  • Water Supply System ₹ 2.66 L est.
  • Storm Water Drainage ₹ 5.82 L est.
  • Electricity Supply System ₹ 1.56 Cr est.
  • Sewage Treatment & Garbage Disposal ₹ 7.08 L est.
  • Street Lighting ₹ 2.16 L est.
  • Security and Fire Fighting ₹ 4.3 L est.
  • Playgrounds and Parks ₹ 50.6 L est.
  • Renewable Energy System ₹ 4.66 L est.
  • Electrification Cost Upto Project ₹ 1.35 Cr est.
  • Circulation of Roads ₹ 35.29 L est.
  • Parking Mechanical Car Parking ₹ 18.89 L est.
  • Underground Water Tank ₹ 4.66 L est.
  • Rain Water Harvesting ₹ 2.65 L est.
  • Sewage Treatment Plant (STP) ₹ 7.06 L est.
  • Electrical Sub Station ₹ 94.26 L est.

Not in this filing Club House / Community Centre Shopping Area School Hospital / Dispensary

External connections

  • Roads CONNECTED
  • Water Supply GMDA
  • Electricity DHBVN
  • Sewage Disposal GMDA
  • Storm Water Drainage GMDA

Specifications

Flooring Details of Various Parts of House
VITRIFIED TILE, LAMINATE WOODEN FLOORING
Wall Finishing Details
PREMIUM ACRYLIC DISTEMPER
Kitchen Details
SINGLE LEVER COUNTER TOP
Bathroom Fittings
CHINAWARE , SINGLE LEVER COUNTER TOP
Wood Work Etc
NO
Doors and Windos Frames
FULL HEIGHT WINDOWS- ALUMINIUM PODER COATED SECTIONS AND WOODEN FRAME WITH FLUSH DOOR WITH VENEER FINISH (ON BOTH SIDES) & ARCHITRAVES
Glass Work
FULL HEIGHT WINDOWS- ALUMINIUM PODER COATED SECTIONS
Electric Fittings
FAN AND ELECTRIC POINT
Conducting and Wiring Details
HEAVY DUTY , MODULAR
Water Storage
YES
External Glazings
12 MM TOUGHNED GLASS DOOR
Windows / Glazings
FULL HEIGHT WINDOWS- ALUMINIUM PODER COATED SECTIONS
Doors
WOODEN FRAME WITH FLUSH DOOR WITH LAMINATE FINISH (ON BOTH SIDES) & ARCHITRAVES
Main Doors
WOODEN FRAME WITH FLUSH DOOR WITH LAMINATE FINISH (ON BOTH SIDES) & ARCHITRAVES
Internal Doors
WOODEN FRAME WITH FLUSH DOOR WITH LAMINATE FINISH (ON BOTH SIDES) & ARCHITRAVES
Air Conditioning
VARIABLE RATE FLOW SYSTEM
Electrical Fittings
HEAVY DUTY CONDUTING MODULAR SWITCHES, C CURVE MCB
Cng Pipe Line
YES
External Finishing / Colour Scheme
EXTERNAL GRADE TEXTURE PAINT
Internal Finishing
PREMIUM ACRYLIC DISTEMPER
Floor
VITRIFIED TILE
Walls
PREMIUM ACRYLIC DISTEMPER
Ceiling
PREMIUM ACRYLIC DISTEMPER
Floor
LAMINATE WOODEN FLOORING
Walls
PREMIUM ACRYLIC DISTEMPER
Ceiling
PREMIUM ACRYLIC DISTEMPER
Floor
VITRIFIED T
Walls
PREMIUM ACRYLIC DISTEMPER
Ceiling
PREMIUM ACRYLIC DISTEMPER
Counters
SINGLE LEVER COUNTER TOP
Sanitary Ware / Cp Fittings
SINGLE LEVER COUNTER TOP
Fitting / Fixtures
SINGLE LEVER COUNTER TOP
Floor
VITRIFIED TILE
Walls
PREMIUM ACRYLIC DISTEMPER
Ceiling
PREMIUM ACRYLIC DISTEMPER
Floor
VITRIFIED TILE
Walls
PREMIUM ACRYLIC DISTEMPER
Ceiling
PREMIUM ACRYLIC DISTEMPER
Counters
SINGLE LEVER COUNTER TOP
Sanitary Ware / Cp Fittings
SINGLE LEVER COUNTER TOP
Fixtures
SINGLE LEVER COUNTER TOP
Floor
VITRIFIED TILE
Walls
PREMIUM ACRYLIC DISTEMPER
Ceiling
PREMIUM ACRYLIC DISTEMPER
Counters
SINGLE LEVER COUNTER TOP
Fixtures
SINGLE LEVER COUNTER TOP
Floor
VITRIFIED TILE
Walls & Ceiling
PREMIUM ACRYLIC DISTEMPER
Toilet
SINGLE LEVER COUNTER TOP
Balcony
IRON ROD
Floor
VITRIFIED TILE
Walls & Ceiling
PREMIUM ACRYLIC DISTEMPER
Railings
IRON ROD
Fixtures
SINGLE LEVER COUNTER TOP
Approvals

Statutory approvals

Approvals declared in Form REP-I Part E.

  • Environment Clearance Obtained

Plans filed with RERA

  • Layout plan
  • Demarcation plan
  • Zoning plan
  • Building plan
  • Site plan
  • Floor plan
  • Apartment plans
  • Elevation section
  • Detail of permissible FAR
  • Detail of covered area achieved FAR
  • Roads and pavement plan
  • Electricity supply plan
  • Water supply plan
  • Sewerage and garbage disposal plan
  • Storm water drainage
  • Street lighting plan
  • Parking plan
Documents

RERA documents

7 documents downloaded from the HRERA portal. Opens as PDF.

Authority

Hearings & orders

Proceedings recorded by the Authority on this registration.

Approved and ready for certificate issuing process View order

Ms. Deepika, Planning Executive and Ms. Asha, Chartered Accountant briefed about the facts of the case. Sh. Navdeep Sardana, Sh. Deepak Pant (AR), Ms. Monika Balhara (AR) are present on behalf of promoter and states that DTCP has granted the additional license vide license No. 158 of 2024 dated 20.11.2024, for an area of 9.7271 acres and the total area of the projects now becomes 19.23126 acres. Further, DTCP has approved the revised phasing vide DRG No. DTCP 10830 having memo no ZP-1942-II/SD(RD)/2025/12531 dated 08.04.2025 and the additional cum revised building plan was approved vide Memo No. ZP-1942-II/SD (RD)/2025/12535 dated 08.04.2025. The AR submits that as per the revised phasing plan there are total 6 phases now. The AR further submits that this application is for the registration of the project “Urban Resort Phase- 6” for an area measuring 0.8519 acres. The AR further submits that service plans and estimates of the whole licensed area i.e., 19.23126 acres has been approved by DTCP vide memo no LC-5229-D/JE(AK)/2025/17299 dated 09.05.2025 and copy of the same is being submitted in the Authority. Further Fire scheme approval for the whole project i.e., 19.23126 acres has been applied in the concerned department and further request to consider one security amount in all the five applications as all phases are under a single licensed colony and thus single approval for fire scheme will be issued by the concerned department. In view of the same, request is allowed. Further, the promote shall submit the BG/DD of Rs 25 lakhs as a security amount to submit the approved fire scheme for the whole project within 4 months of the issuance of registration certificate. Approved as proposed. The registration certificate shall be issued after the submission of form A-H, DPI and other deficit documents along with BG/DD as above.

Call