Ar. Neeraj Gautam, Associate Architectural Executive and Ms. Asha, Chartered Accountant briefed about the facts of the project. Sh. Rohan (AR), Ms. Surabhi Kapoor (AR), Sh. Ayush Gupta (AR) are present on behalf of the promoter. It is noticed by the Authority that an advertisement for booking of the apartment in above project is on the website with the link https://www.godrejupcominglaunch.com/ which is in contravention with the section 3 of the Act of 2016. The AR submits that no advertisement has been issued by the promoter as the only authorized website of the promoter is www.godrejproperties.com and legal action against such unauthorized advertisements has already been taken and its details shall be submitted to the Authority. A show cause notice be issued for reply to the same along with action taken for the above advertisement including a disclaimer in the newspaper. No objection in respect of the public notice issued by the Authority on 28.05.2025 has been received and the site is purchased through open auction from HSVP with public health amenities in place. The registration of the project is approved as proposed subject to the submission of BG/DD of Rs. 25 lakhs each on account of submission of approved fire scheme and EC within four months. The RC shall be issued after the submission of rectified REP-I and above security amount.
- Home
- RERA Projects
- Gurugram
- Godrej Alira
GGM/959/691/2025/62
RERA overview
As filed by the promoter in Form REP-I with HRERA Gurugram.
- businessPromoter
- Godrej Properties Limited
- placeLocation
- GH-01, Urban Estate II, Sector 39, Gurugram
- mapTehsil / District
- Wazirabad St, Gurugram
- verifiedRERA status
- Approved and certificate uploaded
- account_balanceAuthority
- HRERA Gurugram
- edit_calendarApplied on
- 20 May 2025
- architectureLayout plan approved
- —
- constructionConstruction start
- 01 Oct 2025
- event_availableCompletion date
- 30 Apr 2032
- workspace_premiumRegistration valid
- 26 Jun 2025 – 30 Apr 2032
- layersFAR (permissible / proposed)
- 312 / 311
- paymentsEstimated project cost
- ₹ 586.82 Cr
Licence
Land use 1.97 acres in all
Estimated cost ₹ 586.82 Cr in all
Promoter
- Company
- Godrej Properties Limited
- Registered office
- 3rd Floor, Um House, Plot No. 35-P, Sector 44, Gurugram-122002
- CIN
- L74120MH1985PLC035308
Book a free site visit
Latest price, offers and a guided visit of Godrej Alira.
Mr Prashant Agarwal is available to discuss all your queries.
Online now · replies on WhatsApp
Quick questions
Plot sizes
1 sizes · 0 plots registered with RERA. Tap a column to sort.
| Sq yd | Sq ft | Sq m | Plots |
|---|---|---|---|
| 0 | 0 | 0 | 0 |
Areas are as registered with RERA (square metres); square yards and square feet are converted. Final sizes are as per the allotment.
Unit types
134 units in 1 types as registered with RERA.
| Type | Carpet area (sq ft) | Units |
|---|---|---|
| Apartment/Shops/Other Buildings | 283 – 86,673 | 134 |
Carpet areas as filed with RERA (square metres, shown in square feet). Booked / unsold are as on the RERA application date.
Facilities & services
19 facilities in the promoter's service plan estimate · ₹ 31.85 Cr budgeted.
-
add_road
Internal Roads and Pavements ₹ 1.8 Cr est.
-
water_drop
Water Supply System ₹ 8.89 L est.
-
water
Storm Water Drainage ₹ 22.85 L est.
-
bolt
Electricity Supply System ₹ 3.86 Cr est.
-
recycling
Sewage Treatment & Garbage Disposal ₹ 22.85 L est.
-
light
Street Lighting ₹ 38.09 L est.
-
local_fire_department
Security and Fire Fighting ₹ 1.63 Cr est.
-
park
Playgrounds and Parks ₹ 76.65 L est.
-
people
Club House / Community Centre ₹ 10.9 Cr est.
-
store
Shopping Area ₹ 1.67 Cr est.
-
wb_sunny
Renewable Energy System ₹ 24.76 L est.
-
local_parking
Parking ₹ 18.03 L est.
-
check_circle
Sewerage Treatment Plant ₹ 51.44 L est.
-
water_drop
Underground Water Tank ₹ 30.86 L est.
-
water_drop
Rain Water Harvesting ₹ 12.69 L est.
-
check_circle
Soft Scape ₹ 1.4 Cr est.
-
check_circle
Hard Scape ₹ 5.14 Cr est.
-
bolt
Electrical Sub Station ₹ 1.99 Cr est.
-
check_circle
Signages ₹ 38.58 L est.
Not in this filing School Hospital / Dispensary
External connections
- radio_button_uncheckedRoads GMDA
- check_circleWater Supply MCG
- check_circleElectricity DHBVN
- check_circleSewage Disposal MCG
- check_circleStorm Water Drainage GMDA
Specifications
- Flooring Details of Various Parts of House
- VITRIFIED TILING/LAMINATED WOODEN FLOORING/SKID RESISTANT VITRIFIED TILES/WOODEN LOOK SKID RESISTANT TILES
- Wall Finishing Details
- ACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER
- Kitchen Details
- FLOOR: VITRIFIED TILES, WALL: TILE CLADDING 2' ABOVE COUNTER AND OIL BOUND DISTEMPER ABOVE THAT, CEILING: OIL BOUND DISTEMPER
- Bathroom Fittings
- SANITARY FIXTURES & FITTINGS OF REPUTE MAKE
- Wood Work Etc
- LAMINATED/PAINTED FLUSH DOORS/ MOULDED SHUTTER WITH WOODEN FRAME
- Doors and Windos Frames
- MAIN DOOR: DESIGNER DOOR SHUTTER WITH VENEER FINISH INTERNAL DOORS: LAMINATED DOOR SHUTTER EXTERNAL DOOR & WINDOWS: GLAZED WINDOWS ALUMINUM/ UPVC/MS FRAME
- Glass Work
- 4MM AND ABOVE AS PER SPECIFICATIONS
- Electric Fittings
- AS PER BUILDING NORMS
- Conducting and Wiring Details
- AS PER BUILDING NORMS
- Water Storage
- UNDERGROUND AND OVERHEAD WATER TANKS
- Lift Details
- 3 PASSENGER LIFTS AND 1 SERVICE LIFT
- Windows / Glazings
- POWDER COATED/PAINTED ALUMINUM/UPVC WINDOWS WITH 4MM OR ABOVE THICK GLAZING AS PER SPECIFICATIONS
- Doors
- LAMINATED/PAINTED FLUSH DOORS/ MOULDED SHUTTER WITH WOODEN FRAME
- Main Doors
- LAMINATED/PAINTED/POLISHED FLUSH DOORS/ MOULDED SHUTTER WITH WOODEN FRAME
- Internal Doors
- LAMINATED/PAINTED FLUSH DOORS/ MOULDED SHUTTER WITH WOODEN FRAME
- Air Conditioning
- AS PER SPECIFICATION OF STANDARD MAKE
- Electrical Fittings
- AS PER SPECIFICATION OF STANDARD MAKE
- External Finishing / Colour Scheme
- EXTERNAL GRADE PAINTS
- Internal Finishing
- 10 TO 12MM THICK PLASTER ON BLOCKWORKS, RCC WALLS AND COLUMNS WITH CEMENT MORTAR OF 1:5
- Floor
- VITRIFIED TILES
- Walls
- ACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER
- Ceiling
- OIL BOUND DISTEMPER
- Floor
- VITRIFIED TILES
- Walls
- ACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER
- Ceiling
- OIL BOUND DISTEMPER
- Floor
- ANTI SKID CERAMIC TILES
- Walls
- CERAMIC TILES TILL 7FT ON ALL SIDES AND OIL BOUND DISTEMPER PAINT
- Ceiling
- GRID CEILING
- Counters
- STONE
- Sanitary Ware / Cp Fittings
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Floor
- LAMINATED WOODEN FLOORING
- Walls
- ACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER
- Ceiling
- OIL BOUND DISTEMPER
- Floor
- ANTI SKID CERAMIC TILES
- Walls
- CERAMIC TILES TILL 7FT ON ALL SIDES AND OIL BOUND DISTEMPER PAINT
- Ceiling
- GRID CEILING
- Counters
- NOT APPLICABLE
- Sanitary Ware / Cp Fittings
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Floor
- VITRIFIED TILES
- Walls
- CERAMIC / VITRIFIED TILES 2'-0" ABOVE COUNTER & OIL BOUND DISTEMPER
- Ceiling
- OIL BOUND DISTEMPER
- Counters
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Fixtures
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Kitchen Appliances
- NOT APPLICABLE
- Floor
- CERAMIC TILES
- Walls & Ceiling
- ACRYLIC EMULSION/ OIL BOUND DISTEMPER
- Toilet
- OIL BOUND DISTEMPER
- Floor
- ANTI SKID CERAMIC TILES
- Walls & Ceiling
- EXTERNAL GRADE TEXTURE PAINT/ OIL BOUND DISTEMPER
- Railings
- ALL PROVIDED OF STANDARD COMPANY MAKE
Statutory approvals
Approvals declared in Form REP-I Part E.
- verified Building Plans Obtained
- verified Possession Certificate Obtained
- verified Allotment Letter Obtained
- verified Zoning Plan Obtained
Plans filed with RERA
- check_circleLayout plan
- radio_button_uncheckedDemarcation plan
- check_circleZoning plan
- check_circleBuilding plan
- check_circleSite plan
- check_circleFloor plan
- check_circleApartment plans
- check_circleElevation section
- check_circleDetail of permissible FAR
- check_circleDetail of covered area achieved FAR
- check_circleRoads and pavement plan
- radio_button_uncheckedElectricity supply plan
- check_circleWater supply plan
- check_circleSewerage and garbage disposal plan
- radio_button_uncheckedStorm water drainage
- radio_button_uncheckedStreet lighting plan
- check_circleParking plan
RERA documents
50 documents downloaded from the HRERA portal. Opens as PDF.
Plans & layouts
Licence & approvals
CA certificates
Declarations
Other documents
Hearings & orders
Proceedings recorded by the Authority on this registration.
Development schedule
Planned spend each year, from the promoter's quarterly schedule.
Completion committed to RERA: 30 Apr 2032.